1 3 STREET, Brooklyn, NY, 11231 · New York City · 57 total events
Remove/ replace sprinklers with new heads and piping; install temporary sprinkler protection as per plans. Remove plumbing fixtures and install newon 2nd flor. install med medical gas piping cellar through 2nd floor.
KINGS COUNTY HOSPITAL CENTER - ED EXPANSION - SPRINKLER MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
R Bldg Integration of BH: Demolition of existing sprinklers & associated sprinkler branch piping in space back to nearest active main/branch interval. Installation of new sprinklers and associates branch piping. New sprinkler piping connected to existing
ENTIRE BUILDING
Remove and install new ductwork, AHU and chiller as per plans filed herewith for the O.R. on partial 2nd floor, C Building, in the existing hospital as per plans filed herewith.
Remove and install new partitions and finishes for O.R. renovation on partial 2nd as indicated on plans filed herewith only. Work involves no change to zoning, use, egerss, or occupancy.
Structural work including new steel to accommodate hospital Cath Lab renovation on partial 2nd floor in the existing hospital, and install new steel dunnage and modification to existing dunnage to support MEP equipment 1st floor roof.
KINGS COUNTY HOSPITAL CENTER - ED EXPANSION - PLUMBING MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
KINGS COUNTY HOSPITAL CENTER - ED EXPANSION - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS, OR OCCUPANCY.
REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS, AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. NO CHANGE TO EGRESS, OCCUPANCY OR USE.
Renovations of CT room S1N60A per plans filed herewith, No change to use, egress or occupancy
Interior renovations of medical space as per plans filed herewith, No change to use, egress or occupancy
Herewith filing for removal of existing ductwork and installing new. Installing mechanical and chilled water piping as per the plans.
Herewith filing to make modif. to the existing spaces move interior partitions, install new doors,ceilings etc. Also install new 3 D-BiPlane imaging machine and related equip. Related structural work to reinforce in the ceiling attached to exis bldg steel
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
New express care unit: sprinkler installation for fit out
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF 1000# CAPACITY MATERIAL ONLY HOISTS DURING BLDG ALTERATION, FILED SEPARATELY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Kings County Hospital, Bldg P & B connecting pedestrian bridge demo at 4th floor per the plans filed including: Bridge demo, facade panel cladding at P-bldg, masonry wall, railing, roofing & install parapet section on B bldg. Repair spalled concrete.
TEMPORARY NETTING SYSTEM AT FACADE AS PER DRAWINGS. NETTING SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Related mechanical work in Building R integration of behavioral health: duct and insulation, air terminal, air outlet, pre-balancing, testing & balancing of air and hot water, integrating existing controls and providing new controls
Division of a large open room into 13 rooms on the first floor of the R building of Kings County Hospital Center. The new space is inclusive of 4 exam rooms, 3 offices, a conference room, a waiting room, an ADA rest room, 2 storage rooms & a janitor's cl.
Kings County Hospital, Bldg P & B connecting pedestrian bridge demo at 4th floor per the plans filed including: Bridge demo, facade panel cladding at P-bldg, masonry wall, railing, roofing & install parapet section on B bldg. Repair spalled concrete.
Related structural work to reinforce in the ceiling attached to the existing building steel to hold the weight of the new equipment as per the plans. No change in use, egress or occupancy.
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Kenneth Cole
R Bldg Int. of BH: Removal & relocation of existing domestic water piping(cold water, hot water, supply, hot water return).Installation of new plumbing fixtures & associated piping, valves, insulation etc... new plumbing to be connected to existing piping
New express care unit: mechanical modification
New express care unit: partition changes, doors , finishes, ceilings
EMPTY PURGE, CLEAN REMOVE & DISPOSE OF ONE (1) 2,500-GALON UST & ASSOCIATED PIPING & COMPONENTS. INSTALL IN-KIND ONE (1) NEW 2,500-GALON BIODIESEL MOTOR FUEL UST, PIPING FILLBOXES, VEEDER-ROOT TLS-450 PLUS, DISPENSER & ACCESSORIES FOR A COMPLETE SYSTEM.
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Herewith filing for modification of existing sprinkler system and minor plumbing work, No change in use, egress or occupancy.
New express care unit: plumbing modifications/installation
Propose to file for support of excavation. No change in use, egress or occupancy.
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY FENCE AS PER PLANS. TEMPORARY FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Install UV lights or PCO to reduce virus particles & disinfect the cooling coils; install or replace coils, replace existing humidifiers, convert filters to electronic. See comments for PAA scope of work
Pharmacy renovation; replace exhaust fan EF-4 in 4 fl MER & exhaust fan EF-18 in 6 fl MER; All existing ductwork in the pharmacy suite to be cleaned & sealed using Aeorsol technology. Replace all existing ductwork, air outlets & controls. New HEPA filter
Building S pharmacy renovation
Herewith filing for modification of existing sprinkler system and minor plumbing work, No change in use, egress or occupancy.
Sprinkler installation and removal on a portion of the 3 floor for specialty clinic
Building S Pharmacy renovation: 3 heads being removed, 10 heads are being relocated and 11 new heads are being installed
Building S pharmacy renovation: remove 2 fixtures and install 2 fixtures
Mechanical installation of a portion of the third floor for specialty clinic. PAA description in comments
INSTALLATION OF TEMPORARY ELECTRIC/ HAND PULLEY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY WORKING PLATFORM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
REMOVE AND REPLACE EXISTING STANDPIPE RISER IN STAIR A. REMOVE AND REPLACE NON-FUNCTIONING PUMP SERVING WATER EXISTING COMBINATION DOMESTIC- FIRE RESERVE TANK.
Install UV lights or PCO to reduce virus particles & disinfect the cooling coils; install or replace coils, replace existing humidifiers, convert filters to electronic. See comments for PAA scope of work
Kings County Hospital Center :Building A & C: install UV lights or PCO to reduce virus particles & disinfect the cooling coils; install or replace existing humidifiers, convert filters to electronic . See comments for PAA scope
Plumbing installation for a portion of the third floor for the specialty clinic. Remove existing fixtures