3433 3 AVENUE, Bronx, NY, 10456 · New York City · 6 total events
INSTALLATION OF MEDIUM DUTY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
INSTALLATION OF HEAVYDUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
THIS APPLICATION IS FILED FOR 4-STORY 7 UNITS RESIDENTIAL BUILDING
INSTALLATION OF SIDEWALK SHED AS SHOWN ON DRAWINGS. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2014 B.C.