1875 UNIVERSITY AVENUE, Bronx, NY, 10453 · New York City · 33 total events
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MODERATE TENANT IN PLACE INTERIOR APARTMENT RENOVATION TO INCLUDE THE REMOVAL AND REPLACEMENT OF KITCHEN CABINETS, COUNTERTOPS AND APPLIANCES. NEW APARTMENT LIGHT FIXTURE, FINISHES AND WINDOWS. ALL PUBLIC CORRIDORS AND SERVICE AREAS WILL BE RENOVATED
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF UNACCEPTABLE ELECTRONIC MAGNETIC LOCKING DEVICE IINSTALLED AT BUILDING ENTRANCE DOOR
§ 27-2005 ADM CODE PROVIDE IN THE EVENT OF POWER OUTAGE BY MEANS OF AN ACCEPTABLE MECHANICAL HEAVY DUTY LOCK AND LATCH SET BUILDING ENTRANCE DOOR
ELECTRIC/GAS RANGE
MOLD
CEILING
Installation of three (3) Gas-Fired Boilers in Cellar as part of Moderate tenant in place rehabilitation. No Change in Egress, Use, Zoning, or Occupancy.
Gas piping to new boilers, as part of tenant in place moderate rehabilitation. No change in egress, use, or occupancy.
Judgment: NO
Judgment: NO
Judgment: NO
roofing replacement and roof structure repair per plans herewith. no change in use, egress or occupancy under this application.
roofing replacement and roof structure repair per plans herewith. no change in use, egress or occupancy under this application.
INSTALLATION OF SUPPORTED PIPE SCAFFOLD AT 1875 UNIVERSITY AVENUE, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 1875 UNIVERSITY AVENUE, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF NEW SIDEWALK SHED AT 1875 UNIVERSITY AVENUE, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
MATERIAL HOIST SYSTEM AT 1875 UNIVERSITY AVENUE, BRONX.
Judgment: NO
FACADE RESTORATION WORK AS PER INDICATED ON PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF NEW SIDEWALK SHED AT 1875 UNIVERSITY AVENUE, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF PIPE SCAFFOLD AT 1875 UNIVERSITY AVENUE, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 1875 UNIVERSITY AVENUE, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 1875 UNIVERSITY AVENUE, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF NEW SIDEWALK SHED AT 1875 UNIVERSITY AVENUE, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Judgment: NO
Judgment: NO
Judgment: NO
Judgment: NO