166 EAST 205 STREET, Bronx, NY, 10458 · New York City · 10 total events
REFRIGERATOR
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR THAT IS MISSING AT PUBLIC HALL, 1st STORY
§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING, OUTLETS AND WALL SWITCHES THROUGH-OUT IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
POWER OUTAGE
PROPOSED EXTERIOR FACADE RESTORATION AS PER PLAN HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
APARTMENT ONLY
FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.