1609 EAST 174 STREET, Bronx, NY, 10472 · New York City · 82 total events
Apt 11H — Possession
Apt 04C — E
Apt 4A — Eviction
Remove existing domestic water heating system and related piping and install new Gas Domestic water heating system. Replace sump pump(s) and install floor drain as per plans.
Remove existing domestic water heating system and install new gas heating system. Replace sump pump and install floor drain as per plans.
Renovation of the existing space to Training Center
THE WORK CONSISTS OF DEMOLITION OF EXISTING HEATING ELEMENTS AND INSTALLATION OF NEW HVAC & BATHROOM EXHAUST SYSTEM & DUCTWORK FOR BRONX RIVER HOUSE AS SHOWN ON THE PLAN. NO CHANGE IN USE OR EGRESS UNDER THIS APPLICATION.
REMOVE DOMESTIC WATER HEATING SYSTEM AND INSTALL NEW GAS HEATING SYSTEM. REPLACE SUMP PUMPS AND INSTALL FLOOR DRAIN AS PER PLANS.
Remove existing domestic water heating system and install new Gas water heating system. Replace sump pump and install floor drain as per plans.
Remove existing domestic water heating system and install new Gas water heating system. Replace sump pump and install floor drain as per plans.
Remove existing domestic water heating system and install gas domestic water heating system. Replace sump pump and install floor drain as per plans.
1. Construct new concrete pad on grade for new mechanical unit and provide fence with mesh and gate around the new mechanical unit. 2. Repair existing concrete slab and wall. 3. adding new steel lintels for existing non load bearing masonry partition wall
THE WORK CONSISTS OF ADDING ONE ADA BATHROOM AND RENOVATING LUNCH ROOM AND INSTALLATING NEW FIRE SPRINKLER SYSTEM FOR THE ENTIRE SPACE AS SHOWN ON THE PLAN. NO CHANGE IN USE OR EGRESS UNDER THIS APPLICATION.
Remove existing domestic water heating system and install new gas system and replace sump pump.
INFILL CONCRETE ROOF TO AREA OF NEW ROOFACCESS HATCH. REPAIR AREAS OF DAMAGED CONCRETE BEAMS,COLUMNS, AND TRENCH DRAIN WALLS.
General construction work in conjunction with Boiler Upgrade.
Modification to mechanical system in conjunction with Domestic hot water heating system upgrade and boiler upgrade as per plans.
General construction work in conjunction with Boiler Upgrade.
REMOVE STEAM AND CONDENSATE PIPING FOR SERVING DOMESTIC WATER HEATER BACK TO THE STEAM AND CONDENSATE MAINS AND CAP.REMOVE AND REPLACE EXISTING VACUUM CONDENSATE RETURN UNITS AS SHOWN ON PLANS.REPAIR OR REPLACE MALFUNCTIONING STEAM TRAPS INSIDE TANK ETC
General Construction work associated with Boiler Upgrade.
General construction work in conjunction with Boiler Upgrade.
REMOVE STEAM AND CONDENSATE PIPING FOR SERVING DOMESTIC WATER HEATER BACK TO THE STEAM AND CONDENSATE MAINS AND CAP. REMOVE AND REPLACE EXISTING VACUUM CONDENSATE RETURN UNITS AS SHOWN ON PLANS.REPAIR OR REPLACE MALFUNCTIONING STEAM TRAPS INSIDE TANK etc.
REMOVE STEAM AND CONDENSATE PIPING FOR SERVING DOMESTIC WATER HEATER BACK TO THE STEAM AND CONDENSATE MAINS AND CAP.REMOVE AND REPLACE EXISTING VACUUM CONDENSATE RETURN UNITS AS SHOWN ON PLANS.REPAIR OR REPLACE MALFUNCTIONING STEAM TRAPS INSIDE TANK ETC
REMOVE STEAM AND CONDENSATE PIPING FOR SERVING DOMESTIC WATER HEATER BACK TO THE STEAM AND CONDENSATE MAINS AND CAP.REMOVE AND REPLACE EXISTING VACUUM CONDENSATE RETURN UNITS AS SHOWN ON PLANS.REPAIR OR REPLACE MALFUNCTIONING STEAM TRAPS INSIDE TANK ETC
General construction work in conjunction with Boiler Upgrade.
REMOVE STEAM AND CONDENSATE PIPING FOR SERVING DOMESTIC WATER HEATER BACK TO THE STEAM AND CONDENSATE MAINS AND CAP.REMOVE AND REPLACE EXISTING VACUUM CONDENSATE RETURN UNITS AS SHOWN ON PLANS.REPAIR OR REPLACE MALFUNCTIONING STEAM TRAPS INSIDE TANK ETC
REMOVE STEAM AND CONDENSATE PIPING FOR SERVING DOMESTIC WATER HEATER BACK TO THE STEAM AND CONDENSATE MAINS AND CAP.REMOVE AND REPLACE EXISTING VACUUM CONDENSATE RETURN UNITS AS SHOWN ON PLANS.REPAIR OR REPLACE MALFUNCTIONING STEAM TRAPS INSIDE TANK ETC
REMOVE STEAM AND CONDENSATE PIPING FOR SERVING DOMESTIC WATER HEATER BACK TO THE STEAM AND CONDENSATE MAINS AND CAP.REMOVE AND REPLACE EXISTING VACUUM CONDENSATE RETURN UNITS AS SHOWN ON PLANS.REPAIR OR REPLACE MALFUNCTIONING STEAM TRAPS INSIDE TANK ETC
General Construction work in conjunction with Boiler Upgrade.
General construction work in conjunction with Boiler Upgrade.
General Construction filing in conjunction with Boiler Upgrade as per plans.
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 1440 BRONX RIVER AVENUE, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Judgment: NO
Judgment: NO
INSTALLATION OF TEMPORARY BOILERS.
INSTALL 5 NEW BOILERS.
Modification to hot water heating system in said premise as per plans.
REMOVE DOMESTIC HOT WATER HEATING SYSTEM AND INSTALL GAS WATER HEATING SYSTEM. REPLACE SUMP PUMP AND INSTALL NEW FLOOR DRAIN AS PER PLANS.
REMOVE STEAM AND CONDENSATE PIPING FOR SERVING DOMESTIC WATER HEATER BACK TO THE STEAM AND CONDENSATE MAINS AND CAP.REMOVE AND REPLACE EXISTING VACUUM CONDENSATE RETURN UNITS AS SHOWN ON PLANS.REPAIR OR REPLACE MALFUNCTIONING STEAM TRAPS INSIDE TANK ROOMS
REMOVE STEAM AND CONDENSATE PIPING FOR SERVING DOMESTIC WATER HEATER BACK TO THE STEAM AND CONDENSATE MAINS AND CAP.REMOVE AND REPLACE EXISTING VACUUM CONDENSATE RETURN UNITS AS SHOWN ON PLANS.REPAIR OR REPLACE MALFUNCTIONING STEAM TRAPS INSIDE TANK ETC
General construction work in conjunction with Boiler Upgrade.
General Construction work in conjunction with water heater replacement as per plans. See Drawing A1 100.00 for more detailed project scope of work.
WALL
WINDOW FRAME
DOOR TO DUMBWAITER
Installation of temporary above group fuel oil storage tank and associated pump and piping (in conjunction with temporary boiler(s)).
Remove existing domestic water heating station and related piping.Install new gas water heaters and domestic water storage tanks. Install new gas service, replace sump pumps as per plans. No change in use egress or occupancy.
REMOVE 5 BOILERS AND ABANDON FUEL OIL STORAGE TANKS IN PLACE.
TEMPORARY NATURAL GAS AND DOMESTIC COLD WATER PIPING TO SERVE TEMPORARY BOILER AS PER PLANS.
Judgment: NO