155 FOOD CENTER DRIVE, BRONX, NY 10474 · New York City · 6 total events
Plumbing Modifications and Fixture Installations associated with Freezer Renovation. No change to use, egress, or occupancy.
RENOVATION TO RECEIVE, STORE, RIG AND INSTALL ALL REFRIGERATION EQUIPMENT INCLUDING CONDENSING UNITS AND EVAPORATORS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
Installation of new sprinkler heads and piping for the new Freezer build out at Baldor. Connecting to existing system with a new butterfly valve & riser check valve. No change in use, egress, or occupancy.
THIS SET OF DRAWINGS INCLUDES STRUCTURAL UPGRADES TO ROOF AND WALL SYSTEM AS REQUIRED. IT ALSO INCLUDES TIES OF THE NEW SLAB TO EXISTING WALL SYSTEM.
THIS SET OF DRAWINGS INCLUDES DEMOLITION OF EXISTING SLABS, DOCK AREA AND ASSOCIATED MATERIALS TO ALLOW FOR THE NEW CONSTRUCTION OF AN INTERIOR BOX-IN-BOX FREEZER WITHIN AN EXISTING COOLER WAREHOUSE SPACE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF HIGH PILED STORAGE SHELVING UNITS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.