1377 7 BROTHERS SQUARE, Bronx, NY, 10452 · New York City · 30 total events
Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy.
Proposed Installation and Modifications to mechanical systems as per plans filed herewith. No change in use, egress, or occupancy under this application.
INSTALLATION OF NEW SPRINKLER SYSTEM INCLUDING A NEW SPRINKLER BOOSTER PUMP AND FLOOR CONTROL VALVE ASSEMBLIES THROUGHOUT. INSTALLATION OF A NEW MANUAL WET CLASS I FIRE STANDPIPE SYSTEM THROUGHOUT THE BUILDING.
INSTALLATION OF NEW SPRINKLER SYSTEM INCLUDING A NEW SPRINKLER BOOSTER PUMP AND FLOOR CONTROL VALVE ASSEMBLIES THROUGHOUT. INSTALLATION OF A NEW MANUAL WET CLASS I FIRE STANDPIPE SYSTEM THROUGHOUT THE BUILDING.
Modification to existing combined Sprinkler and Standpipe system as per plans filed herewith.
Removal and installation of interior nonbearing partitions as per plans filed herewith. No change in egress or occupancy under this application.
Structural revision of existing balcony structure, removal of existing columns, new roof terrace floor, and new steel dunnage as per plans filed herewith. no change in use, egress or occupancy.
PIPE SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
SIDEWALK SHED PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Structural revision of existing balcony structure, removal of existing columns, new roof terrace floor, and new steel dunnage as per plans filed herewith. no change in use, egress or occupancy.
Modification to existing Plumbing fixtures as per plans filed herewith
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
REPLACEMENT OF EXISTING PLUMBING RISERS INCLUDING COLD/HOT/ HOT WATER RETURN, WASTE, VENT, GAS, AND STORM. As per plans filed herewith
MATERIAL HOIST PROPOSED INSTALLATION OF MATERIAL HOIST AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
PLASTIC BARRICADE PROPOSED INSTALLATION OF PLASTIC BARRICADE AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
Proposed Installation and Modifications to mechanical systems as per plans filed herewith. No change in use, egress, or occupancy under this application.
MODIFICATION TO SPRINKLER SYSTEMS PER PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Existing elevator bulkhead extension and new lift installation filed herewith. No change of use, occupancy or egress.
MODIFICATIONS TO PLUMBING SYSTEMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION