Drop this scorecard into a tenant guide, blog post, or wiki. It updates itself as new violations are filed.
Woodlawn · March 2026
Best & worst months to sign a lease
Potential savings: ~15% by timing your move to August.
Asking rent per bedroom type — switch tabs to see each with effective (concession-net) rent.
Monthly counts over the last 7 years · all data sources
No HPD records on file in the last 7 years.
Portfolio-level grade reflects the landlord's buildings across the city, weighted by unit count. Individual building grades may differ.
View full landlord profileTop 5 by score · of 111 total
ACRIS deeds and regulatory filings
Woodlawn sits just south of Hyde Park and is experiencing one of Chicago's most dramatic transformations — the Obama Presidential Center is under construction, bringing investment and controversy in equal measure.
DOB Violation — MAINTAIN EXIT SIGN ILLUMINATED
DOB Violation — POST APPROVED OCCUPANCY CARD
DOB Violation — REPAIR INTERIOR WALLS/CEILING
DOB Violation — POST APPROVED OCCUPANCY CARD
DOB Violation — REPAIR DOWNSPOUT
DOB Violation — PRV FLOOR DRAIN WITH METAL STR
DOB Violation — MAINTAIN EXIT SIGN ILLUMINATED
DOB Violation — DOOR W/PANIC HRDWR-200+ ASMBLY
DOB Violation — INTERIOR FINISH FIRERESISTANCE
DOB Violation — PROVIDE