8 on file — type breakdown not available.
ARRANGE PREMISE INSPECTION
Disposition: COMPLIED
PROPER MATRL WATER SUPPLY PIPE
Disposition: COMPLIED
PROPER MATRL WATER SUPPLY PIPE
Disposition: COMPLIED
SUPPLY HOT WTR MIN TEMP 120DEG
Disposition: COMPLIED
REPLACE DEFECTIVE PLBG FIXTURE
Disposition: COMPLIED
PRV DISCHARGE PIPE FROM PRV
Disposition: COMPLIED
REPAIR DEFECTIVE FITTINGS
Disposition: COMPLIED
SOIL/WASTE,VENT PIPE MATRL
Disposition: COMPLIED