2019 CBC SPR: NEW THREE-STORY WOOD PORCH TO REPLACE EXISTING IN PLACE ON AN EXISTING THREE-STORY THREE-UNIT BUILDING, TYPE III-A CONSTRUCTION, R-5 OCCUPANCY.
PRV CLEANOUT AT BASE OF STACK
ARRANGE PREMISE INSPECTION
DEFECTIVE OUTLETS
OPEN
STOP ODORS RPR DFT SEWAGE SYS
STOP LEAKING WATER
REMV OBSTR FROM DRAINAGE SYSTM
INSTALL COVERS