CORRECT MASONRY PER BUILDING VIOLATIONS DATED 5-24-18. (NO WORK OVER PUBLIC WAY)- (NO STRUCTURAL WORK)- ALL WORK SAME AS EXISTING; SUBJECT TO FIELD INSPECTIONS
PROTECT SIDEWALK DURING CONST
POST OWNER/MANAGERS NAME/#
PARAPET
ARRANGE PREMISE INSPECTION
REPAIR WINDOW SILLS
REPAIR EXTERIOR WALL
REPAIR EXTERIOR WALL
NO KEY TO USE EXIT DOOR
ARRANGE PREMISE INSPECTION
REPAIR AREAWAY WALL
POST OWNER/MANAGERS NAME/#
REPAIR PORCH SYSTEM
REPAIR EXTERIOR STAIR
OBSTRUCTIONS IN EXIT WAY
REPAIR DEFECTIVE FOUNDATION
REPAIR WINDOW SILLS