Drop this scorecard into a tenant guide, blog post, or wiki. It updates itself as new violations are filed.
Woodlawn · March 2026
Best & worst months to sign a lease
Potential savings: ~15% by timing your move to August.
Asking rent per bedroom type — switch tabs to see each with effective (concession-net) rent.
Monthly counts over the last 7 years · all data sources
No HPD records on file in the last 7 years.
Portfolio-level grade reflects the landlord's buildings across the city, weighted by unit count. Individual building grades may differ.
View full landlord profileTop 5 by score · of 7 total
ACRIS deeds and regulatory filings
Woodlawn sits just south of Hyde Park and is experiencing one of Chicago's most dramatic transformations — the Obama Presidential Center is under construction, bringing investment and controversy in equal measure.
DOB Violation — GRADE AND DRAIN LOT
DOB Violation — EXIT THROUGH BEDROOM/BATHROOM
DOB Violation — ARRANGE PREMISE INSPECTION
DOB Violation — REPAIR PORCH SYSTEM
DOB Violation — SCREEN OUTER DOORS, WINDOWS
DOB Violation — SERVICE WALK, PASSAGE, AREAWAY
DOB Violation — STOP STORING GARBAGE
DOB Violation — MICE/RODENTS
Building Violation — No details available
DOB Violation — REPAIR EXTERIOR DOOR HARDWARE
RLTO, scofflaw, and city programs
Chicago Energy Rating disclosure · 2022