PERMIT EXPIRES ON 07/07/2025 ERECTION STARTS: 5/28/2025, ERECTION ENDS: 6/11/2025. LARGE TENT2025 UOFC CONVOCATION LARGE TENTTENTS- PEER REVIEW- SELF CERT- 1 DAY EVENT 6/7/2025, NINE (9) STRUCTURES- TWO GANGED STRUCTURES, GANGED STRUCTURE ONE- TWO (2) 10X50 FRAME, ONE (1) 20X40 FRAME, TWO (2) 20X180 (6MX24M) STRUCTURE; GANGED STRUCTURE TWO- ONE (1) 30X60 (9MX18M) STRUCTURE, ONE (1) 40X60 (12MX18M) STRUCTURE, ONE (1) 40X80 (12MX24M) STRUCTURE, AND ONE (1) 40X120 (12MX36M) STRUCTURE TENT. SETUP 5
PERMIT EXPIRES ON 07/07/2025 ERECTION STARTS: 5/28/2025, ERECTION ENDS: 6/11/2025. 2025 UOFC CONVOCATION SMALL TENT / STRUCTURETENT/PLATFORM/STRUCTURE- SELF CERT- 1 DAY EVENT 6/7/2025, FORTY-TWO (42) STRUCTURES- THREE (3) 15X30 FRAME, ONE (1) 20X40 FRAME, THREE (3) 20X60 FRAME, THREE (3) 20X80 FRAME, TWO (2) 20X120 FRAME, ONE (1) 40X70 (12MX21M) STRUCTURE, TWO (2) 50X30 (15MX9M) ARCUM STRUCTURE, TWO (2) 66X33 (20MX10M) ARCUM STRUCTURE, ONE (1) 115X33 (35MX10M) STRUCTURE, THREE (3) 32X20X2.6 STA
LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. INSTALL SECURITY. SPECIFIC LOCATION: RESEARCH MACHINE ROOM.
PERMIT EXPIRES ON 11/19/2024 ERECTION STARTS: 9/20/2024, ERECTION ENDS: 9/23/2024. U OF C ALUMNITENT- PEER REVIEW - 3 DAY EVENT ( 9/21/2024)ERECT SIX (6) STRUCTURES, MAKING TWO (2) SEPARATE GANGED TENTS, GANGED TENT 1- ONE (1) 6X10 FRAME, ONE (1) 9X10 FRAME, ONE (1) 20X30 (6MX9M) STRUCTURE, ONE (1) 50X100 (15MX30M) STRUCTURE. GANGED TENT 2- ONE (1) 6X20 FRAME, ONE (1) 6X40 FRAME, AND 20X40 (6MX12M) STRUCTURE.ERECT 9/20/2024- REMOVE 9/23/2024, ASSEMBLY
PERMIT EXPIRES ON 11/09/2024 ERECTION STARTS: 9/18/2024, ERECTION ENDS: 9/22/2024. U OF C ALUMNITENT- PEER REVIEW - 3 DAY EVENT ( 9/21/2024)ERECT SIX (6) STRUCTURES, MAKING TWO (2) SEPARATE GANGED TENTS, GANGED TENT 1- ONE (1) 6X10 FRAME, ONE (1) 9X10 FRAME, ONE (1) 20X30 (6MX9M) STRUCTURE, ONE (1) 50X100 (15MX30M) STRUCTURE. GANGED TENT 2- ONE (1) 6X20 FRAME, ONE (1) 6X40 FRAME, AND 20X40 (6MX12M) STRUCTURE.ERECT 9/18/2024- REMOVE 9/22/2024, ASSEMBLY
PERMIT EXPIRES ON 07/23/2024 ERECTION STARTS: 5/22/2024, ERECTION ENDS: 6/5/2024. 2024 UOFC CONVOCATION LARGE SUBMITTALTENTS- PEER REVIEW- SELF CERT- 1 DAY EVENT 6/1/2024, TEN (10) STRUCTURES- TWO GANGED STRUCTURES, GANGED STRUCTURE ONE- TWO (2) 10X50 FRAME, ONE (1) 20X40 FRAME, TWO (2) 20X180 FRAME, GANGED STRUCTURE TWO- ONE (1) 30X60 STRUCTURE, ONE (1) 40X60 STRUCTURE, ONE (1) 40X80 STRUCTURE, AND ONE (1) 30X160 STRUCTURE, ONE (1) 40X120 STRUCTURE TENT. SETUP 5/22/2024- REMOVE 6/5/2024, ASS
PERMIT EXPIRES ON 07/21/2024 ERECTION STARTS: 5/22/2024, ERECTION ENDS: 6/5/2024. 2024 UOFC CONVOCATION SMALL SUBMITTALTENT/PLATFORM/STRUCTURE- SELF CERT- 1 DAY EVENT 6/1/2024, THIRTY (31) STRUCTURES- ONE (1) 6X80 FRAME, ONE (1) 20X30 FRAME, ONE (1) 20X40 FRAME, TWO (2) 20X80 FRAME, ONE (1) 40X70 (12MX21M) STRUCTURE, FIVE (5) 50X30 (15MX9M) STRUCTURE, ONE (1) 66X33 (20MX10M) STRUCTURE, ONE (1) 115X33 (35MX10M) STRUCTURE, FIVE (5) 32X20X2.6 STAGE PLATFORMS, ONE (1) 48X20X3.3 STAGE PLATFORM, ONE
PERMIT EXPIRES ON 07/10/2024 ERECTION STARTS: 5/13/2024, ERECTION ENDS: 5/19/2024. U OF C ALUMNI WEEKEND TENT- PEER REVIEW - 3 DAY EVENT ( 5/17/2024-5/19/2024)ERECT FIVE (5) STRUCTURES, MAKING TWO (2) SEPARATE GANGED TENTS, GANGED TENT 1- ONE (1) 6X10 FRAME, ONE (1) 30X40 (9MX12M) STRUCTURE, ONE (1) 66X98 (20MX30M) STRUCTURE, GANGED TENT 2- ONE (1) 10X20 (3MX6M) STRUCTURE, ONE (1) 30X50 (9MX15M) STRUCTURE.ERECT 5/13/2024- REMOVE 5/19/2024, ASSEMBLY
SECURITY SYSTEM WORK ( UOFC JONES LAB BIKE RACK EXT CAM) (CXSU230825C)
SECURITY SYSTEM WORK ( UOFC JONES LAB BIKE RACK EXT CAM) (CXSU230825C)
REPLACE (6) ELECTRICAL CIRCUITS WITH NEW TO POND PUMP EQUIPMENT.
REPLACE (6) ELECTRICAL CIRCUITS WITH NEW TO POND PUMP EQUIPMENT.
TEMP POWER FOR HYDE PARK SUMMERFEST EVENT
PERMIT EXPIRES ON 07/04/2023 ERECTION STARTS: 5/27/2023, ERECTION ENDS: 6/7/2023. TENTS- PEER REVIEW- SELF CERT- 1 DAY EVENT 6/3/2023, 2023 UOFC CONVOCATION LARGE SUBMITTALNINE (9) STRUCTURES- TWO GANGED STRUCTURES, GANGED STRUCTURE ONE- TWO (2) 10X50 FRAME, ONE (1) 20X40 FRAME, TWO (2) 20X180 FRAME, GANGED STRUCTURE TWO- ONE (1) 30X60 STRUCTURE, ONE (1) 40X60 STRUCTURE, ONE (1) 40X80 STRUCTURE, AND ONE (1) 40X120 STRUCTURE TENT. SETUP 5/27/2023- REMOVE 6/7/2023 ASSEMBLY
PERMIT EXPIRES ON 07/04/2023 ERECTION STARTS: 5/27/2023, ERECTION ENDS: 6/7/2023. TENT/PLATFORM/STRUCTURE- SELF CERT- 1 DAY EVENT 6/3/2023, 2023 UOFC CONVOCATION SMALL SUBMITTALTHIRTY-ONE (31) STRUCTURES-, ONE (1) 20X30 FRAME, ONE (1) 20X40 FRAME, TWO (2) 20X80 FRAME, ONE (1) 40X70 STRUCTURE, SIX (6) 50X16 STRUCTURE, ONE (1) 100X33 STRUCTURE, SEVEN (7) 32X20X32 STAGES, ONE (1) 96X28X56 STAGE, FOUR (4) LED TRUSS WALL 21.5X11.75X18.5, FOUR (4) LED PLATFORM 12X4X4, ONE (1) 96X28X56" STAGE, TWO (2)
PERMIT EXPIRES ON 07/01/2023 ERECTION STARTS: 5/14/2023, ERECTION ENDS: 5/22/2023. TENT- PEER REVIEW - 3 DAY EVENT ( 5/18/2023-5/20/2023)U OF C ALUMNI WEEKENDERECT NINE (10) STRUCTURES MAKING THREE (3) SEPARATE GANGED TENTS, GANGED TENT 1- ONE (1) 6X10 FRAME, ONE (1) 30X40 (9MX12M) STRUCTURE, ONE (1) 66X98 (20MX30M) STRUCTURE, GANGED TENT 2- ONE (1) 10X10 (3MX3M) STRUCTURE, ONE (1) 10X20 (3MX6M) STRUCTURE, ONE (1) 10X30 (3MX9M) STRUCTURE, ONE (1) 30X40 (9MX12M) STRUCTURE, ONE (1) 40X98 (12MX30M
TEMPORARY GENERATOR POWER FOR SATURDAY JUNE 3 GRADUATION CEREMONIES
PERMIT EXPIRES ON 07/17/2022 ERECTION STARTS: 5/28/2022, ERECTION ENDS: 6/8/2022. TENTS - PEER REVIEW, REINSTATE PERMIT 100816861, 1 DAY EVENT 6/4/22, 2022 UOFC CONVOCATION LARGE SUBMITTALERECT 13 TEMPORARY STRUCTURES FOR THREE GANGED TENTS. GANGED TENTS AS FOLLOWS, OVER ALL 48'X150' TENT CONSISTING OF ONE(1) 20X20 FRAME, ONE(1) 7X20 FRAME, ONE(1) 40 X 60 (12MX18M) STRUCTURE, ONE(1) 30X60 (9MX18M) STRUCTURE, ONE(1) 40 X80 (12MX24M) STRUCTURE; OVER ALL 161'X180' TENT CONSISTING OF TWO (2) 20X180
PERMIT EXPIRES ON 07/17/2022 ERECTION STARTS: 5/28/2022, ERECTION ENDS: 6/8/2022. TENT/PLATFORM/STRUCTURE- SELF CERT, REINSTATE PERMIT 100816858, 1 DAY EVENT 6/4/20222022 UOFC CONVOCATION SMALL SUBMITTAL ERECT 35 TEMPORARY STRUCTURES; 9 PLATFORM STRUCTURES, ONE(1)- 28X96X4.4, ONE(1)-16X32X4, FIVE(5)- 16X32X3.1, TWO(2)-16X32X2.5; 8 LED SCREEN STRUCTURES, FOUR(4)- 8X12X10, FOUR(4)- 23X30X17.5; TWO(2) ARRAY TOWERS - 18.5X21.5X37.2, AND 16 TENTS, ONE(1) 6X50 FRAME, ONE(1) 7X80 FRAME, ONE(1) 15X30 F
TEMPORARY EVENT SETUP UNIVERSITY OF CHICAGO GRADUATION 2022 2 PORTABLE GENERATORS
PERMIT EXPIRES ON 11/16/2021 ERECTION STARTS: 9/18/2021, ERECTION ENDS: 9/25/2021. TENT- SELF CERT- 5 DAY EVENT 9/20/2021- 9/24/2021 U OF C FRESHMAN ORIENTATION ERECT ONE (1) 66X33 (20MX10M) STRUCTURE TENT SETUP 9/18/21- REMOVE 9/25/21ASSEMBLY **** SELF CERTIFICATION **** CONDITIONAL APPROVAL **** SUBJECT TO FIELD INSPECTION **** AOR CERTIFICATE OF INSPECTION REQUIRED ****
PERMIT EXPIRES ON 11/08/2021 ERECTION STARTS: 9/18/2021, ERECTION ENDS: 9/25/2021. STRUCTURES- SELF CERT- 5 DAY EVENT 9/20/2021- 9/24/2021FROST- U OF C FRESHMAN ORIENTATIONERECT 7 TEMPORARY STRUCTURES; ONE (1) PLATFORM STRUCTURES- 48X 24X 3.8, TWO (2) SOUND TOWERS- 21.5 X 18.4 X37.25, TWO (2) LED TRUSS STRUCTURES- 11.7X21.5X18.5, AND TWO (2) LED SCREEN STRUCTURES- 8X12X4 SETUP 9/18/21- REMOVE 9/25/21ASSEMBLY
SC 2019 CBRC- U OF C - PD43 - INTERIOR ALTERATIONS TO EXISTING 6TH FLOOR OFFICE SPACE TO COMBINE 2 INDIVIDUAL OFFICES INTO A SINGLE OFFICE AS PER PLANS. TYPE B USE - IIA CONST.
FALL PROTECTION WORK ENCOMPASING REMOVING THE OLD FALL PROTECTION SYSTEM AND INSTALLING NEW WALL MOUNTED DAVITS AND NEW ROOF MOUNTED DAVITS AND CABLING.
REMOVE/REPLACE 22 LIMETONE ASHLAR UNITS
PERMIT EXPIRES ON 08/03/2021 ERECTION STARTS: 6/6/2021, ERECTION ENDS: 6/15/2021. STRUCTURES- SELF CERT- 5 DAY EVENT 6/9/2021- 6/13/2021 UNIVERSITY OF CHICAGO CONVOCATION STRUCTURES ERECT 16 TEMPORARY STRUCTURES; FOUR(4) ARRAY TOWERS- 18.5X 21.5X 37.2, TWO(2) PLATFORM STRUCTURES- 48X 20 X 3.5, FOUR(4) LED SCREEN STRUCTURES- 8X12X4, SIX(6) LED TRUSS STRUCTURES- 1.7X21.5X16.83. SETUP 6/6/21- REMOVE 6/15/21 ASSEMBLY **** SELF CERTIFICATION **** CONDITIONAL APPROVAL **** SUBJECT TO FIELD INSPECTIO
PERMIT EXPIRES ON 08/02/2021 ERECTION STARTS: 6/6/2021, ERECTION ENDS: 6/19/2021. TENT- SELF CERT- 5 DAY EVENT 6/9/2021- 6/13/2021 UNIVERSITY OF CHICAGO CONVOCATION TENTS ERECT 3 TEMPORARY STRUCTURES; ONE(1) 50X16 (15MX5M) STRUCTURE, TWO(2) 66X33 (20MX10M) STRUCTURE, SETUP 6/6/21- REMOVE 6/19/21 ASSEMBLY **** SELF CERTIFICATION **** CONDITIONAL APPROVAL **** SUBJECT TO FIELD INSPECTION **** AOR CERTIFIATE OF INSPECTION REQUIRED ****
LIGHTING RETROFIT
PERMIT EXPIRES ON 08/06/2019 ERECTION STARTS: 6/2/2019, ERECTION ENDS: 6/18/2019. ERECTION STARTS: 6/2/2019, ERECTION ENDS: 6/18/2019. TENTS W/PEER REVIEW- 1 DAY EVENT 6/15/19, 2019 U OF C CONVOCATION LARGE SUBMITTAL ERECT 13 TEMPORARY STRUCTURES FOR THREE GANGED TENTS. GANGED TENTS AS FOLLOWS, OVER ALL 48'X150' TENT CONSISTING OF ONE(1) 20X20 FRAME, ONE(1) 7X20 FRAME, ONE(1) 40X60 (12MX18M) STRUCTURE, ONE(1) 30¿X60¿ (9MX18M) STRUCTURE, ONE(1) 40X80(12MX24M) STRUCTURE; OVER ALL 161'X180' TENT
PERMIT EXPIRES ON 07/20/2019 ERECTION STARTS: 6/2/2019, ERECTION ENDS: 6/18/2019. ERECTION STARTS: 6/2/2019, ERECTION ENDS: 6/18/2019. TENT/PLATFORM/STRUCTURE- SELF CERT- 1 DAY EVENT 6/15/19, 2019 U OF C CONVOCATION SMALL SUBMITTAL ERECT 35 TEMPORARY STRUCTURES; 9 PLATFORM STRUCTURES, ONE(1)- 28X96X4.4, ONE(1)-16X32X4, FIVE(5)- 16X32X3.1, TWO(2)-16X32X2.5; 8 LED SCREEN STRUCTURES, FOUR(4)- 8X12X10, FOUR(4)- 23X30X17.5; TWO(2) ARRAY TOWERS - 18.5X21.5X37.2, AND 16 TENTS, ONE(1) 6X50 FRAME, ONE(
No details available
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN EXIT SIGN ILLUMINATED
ILLUMINATE PUBLIC STAIR/HALL
PROVIDE
MAINTAIN OR REPAIR ELECT ELEVA
LIFE SAFETY EVALUATION PLAN