LINE VOLTAGE ELECTRICAL WORK. ADD 10 CIRCUITS TO EXISTING 20 AMP SERVICE DISCONNECTING MEANS. RECEPTACLE OUTLETS: 10 . LIGHTING OUTLETS: 1. ELECTRIC VEHICLE SUPPLY EQUIPMENT:10 SPACES. SPECIFIC LOCATION: PARKING LOT.
FIRE ALARM: MODIFICATION OF EXISTING SYSTEM. ASSOCIATED BUILDING PERMIT:101050651. AFFECTS: 0 DWELLING UNITS; 1 NON-RESIDENTIAL UNITS. HIGH-RISE BUILDING: NO. VOICE COMMUNICATION: YES. SPECIAL LOCKING: YES. MONITORING TYPE: SUPERVISING STATION . SPECIFIC LOCATION: LOWER LEVEL.
SPR 2019 CBRC: ***STRUCTURAL PEER REVIEW*** INSTALLATION OF NEW OXYGEN TANKS AND EVAPORATORS INTO AN EXISTING TANK FARM AREAWELL THAT IS WITHIN AN EXISTING PARKING GARAGE STRUCTURE (S2) OCCUPANCY. PROJECT ALSO INCLUDES REPLACEMENT OF AN EXISTING LOUVER SYSTEM WITH A NEW SECURITY GRILLE AND GATES AT THE EXTERIOR WALL OF THE EXISTING TANK FARM AREA WELL. INSTALLATION OF A NEW FILL BOX MECHANISM TO FACILITATE FILLING OXYGEN TANKS FROM A DELIVERY TRUCK. THE EXISTING AREA WELL IS SEPARATED FROM ADJAC
FIRE ALARM: MODIFICATION OF EXISTING SYSTEM. ASSOCIATED BUILDING PERMIT:101050651. AFFECTS: 0 DWELLING UNITS; 1 NON-RESIDENTIAL UNITS. HIGH-RISE BUILDING: YES. VOICE COMMUNICATION: YES. SPECIAL LOCKING: YES. MONITORING TYPE: SUPERVISING STATION . SPECIFIC LOCATION: LEVEL 2C.
OCTOBER 2024 MONTHLY MAINTENANCE
SEPTEMBER 2024 MONTHLY MAINTENANCE
PERMIT EXPIRES ON 09/30/2024 ERECTION STARTS: 8/24/2024, ERECTION ENDS: 8/24/2024. CBC2019 - PEPSI DIG DAY STAGE AT THE DUSABLE HISTORY MUSEUM - SUNKEN GARDEN. 1-SL100 24X20 MOBILE STAGE WITH WINGS. PATINOS MUSIC LLC.
AUGUST 2024 MONTHLY MAINTENANCE
JULY 2024 MONTHLY MAINTENANCE
JUNE 2024 MONTHLY MAINTENANCE
MAY 2024 MONTHLY MAINTENANCE
APRIL 2024 MONTHLY MAINTENANCE
MARCH 2024 MONTHLY MAINTENANCE
FEBRUARY 2024 MONTHLY MAINTENANCE
JANUARY 2024 MONTHLY MAINTENANCE
JANUARY 2024 MONTHLY MAINTENANCE
**FIRE ALARM PERMIT**MODIFICATION OF AN EXISTING, APPROVED HIGH RISE FIRE ALARM/VOICE EVACUATION SYSTEM WITH DUAL CHANNEL AMPLIFIERS (PER CBC 13-76) TO ACCOMMODATE BUILDOUT.
**FIRE ALARM PERMIT**MODIFICATION OF AN EXISTING, APPROVED HIGH RISE FIRE ALARM/VOICE EVACUATION SYSTEM WITH DUAL CHANNEL AMPLIFIERS (PER CBC 13-76) TO ACCOMMODATE BUILDOUT.
DECEMBER 2023 MONTHLY MAINTENANCE
DECEMBER 2023 MONTHLY MAINTENANCE
NOVEMBER 2023 MONTHLY MAINTENANCE
NOVEMBER 2023 MONTHLY MAINTENANCE
**FIRE ALARM PERMIT**MODIFICATION OF AN EXISTING, APPROVED HIGH RISE FIRE ALARM/VOICE EVACUATION SYSTEM WITH DUAL CHANNEL AMPLIFIERS (PER CBC 13-76) TO ACCOMMODATE BUILDOUT. SPEAKERS STROBES WILL BE USED FOR PRE-SIGNAL, GENERAL ALARM, AND VOICE EVACUATION.
**FIRE ALARM PERMIT**MODIFICATION OF AN EXISTING, APPROVED HIGH RISE FIRE ALARM/VOICE EVACUATION SYSTEM WITH DUAL CHANNEL AMPLIFIERS (PER CBC 13-76) TO ACCOMMODATE BUILDOUT. SPEAKERS STROBES WILL BE USED FOR PRE-SIGNAL, GENERAL ALARM, AND VOICE EVACUATION.
OCTOBER 2023 MONTHLY MAINTENANCE
OCTOBER 2023 MONTHLY MAINTENANCE
SEPTEMBER 2023 MONTHLY MAINTENANCE
AUGUST 2023 MONTHLY MAINTENANCE
SC 2019 CBRC: INTERIOR RENOVATION FOR EXISTING LOCKER-LOUNGE ROOMS AND CT SCAN ROOM ON THE FIRST FLOOR AND MEZZANINE, 5656 S MARYLAND AVE, 10 STORY BUILDING. SCOPE INCLUDES GENERAL CONSTRUCTION, MECHANICAL, ELECTRICAL, PLUMBING, AND STRUCTURAL. CURRENT USE: (I-2 HOSPITAL);
JULY 2023 MONTHLY MAINTENANCE
**FIRE ALARM PERMIT**MODIFICATION OF AN EXISTING, APPROVED HIGH RISE FIRE ALARM/VOICE EVACUATION SYSTEM WITH DUAL CHANNEL AMPLIFIERS (PER CBC 13-76) TO ACCOMODATE BUILDOUT. SPEAKERS WILL BE USED FOR PRE-SIGNAL, GENERAL ALARM, AND VOICE EVACUATION.
SPR 2019 CBC: U OF C - PROPOSED UNDERGROUND SERVICE TUNNEL AND EARTH RETENTION SYSTEM UNDERNEATH SOUTH MARYLAND AVENUE LINKING AN EXISTING LOADING DOCK IN EXISTING ADJACENT PARKING BUILDING WITH A PROPOSED, FUTURE HOSPITAL STRUCTURE. TUNNEL ADDITION IS FOR MATERIALS TRANSFER BETWEEN BUILDINGS ONLY; NO PUBLIC CIRCULATION. TYPE 1A CONST, U OCCUPANCY. 5656 S MARYLAND.
JUNE 2023 MONTHLY MAINTENANCE
SC 2019 CBRC: U OF C - INTERIOR RENOVATION OF FIRST FLOOR WAITING / RECEPTION AREA TO INCLUDE A NEW SECURITY OFFICE, NEW LIGHT FIXTURES AND ELECTRICAL OUTLETS, NEW HVAC SUPPLY GRILL DISTRIBUTION, NEW SPRINKLER HEAD CONNECTED TO MAIN RISER, AND NO STRUCTURAL WORK IN THE SCOPE. I-2 OCC, 1-A CONST.
MAY 2023 MONTHLY MAINTENANCE
APRIL 2023 MONTHLY MAINTENANCE
MARCH 2023 MONTHLY MAINTENANCE
FEBRUARY 2023 MONTHLY MAINTENANCE
JANUARY 2023 MONTHLY MAINTENANCE
DECEMBER MONTHLY MAINTENANCE
NOVEMBER MONTHLY MAINTENANCE
OCTOBER MONTHLY MAINTENANCE
SEPTEMBER MONTHLY MAINTENANCE
AUGUST MONTHLY MAINTENANCE
JULY MONTHLY MAINTENANCE
JUNE MONTHLY MAINTENANCE
MAY MONTHLY MAINTENANCE
APRIL MONTHLY MAINTENANCE
MARCH MONTHLY MAINTENANCE
MONTH OF FEBRUARY 2022 MAINTENANCE PERMIT