SPR 2019 CBC, INTERIOR ALTERATION OF PORTION OF 2ND FLOOR IN A 2 STORY TYPE 1A CONSTRUCTION BUILDING FORMERLY USED A SCHOOL CONNECTED TO A CHURCH. ALTERATIONS TO CLASSROOMS FOR USE AS BALLET STUDIOS FOR INSTRUCTION OF CHILDREN AGES 4-18 PER PLANS. ALTERATIONS INCLUDE NEW DOOR CONFIGURATIONS, NEW FLOOR AND WALL FINISHES, NEW LIGHTING AND ELECTRICAL. NO CHANGE TO EXISTING HVAC. NO CHANGE TO EXISTING SITE OR OFF-STREET PARKING.
REMOVE WIRING FROM CONDUIT TO REDO CONDUIT FOR DROP CEILING
DROP SMOKES FROM HARD CEILING DOWN TO DROP CEILING
ACCESS TO ROOF
ARRANGE FOR RE-INSPECTION
ARRANGE COMPLETED PERMIT INSP.
REWORK FIRE ALARM FOR PARISH HOUSE REMODEL
ALTERATIONS TO EXISTING CHURCH /CLASSROOMS PARTITIONS WITH ATTENDANT DEMOLITION OF WALLS AND UTILITIES.. ALTERATIONS TO EXISTING STAIRS AND EGRESS SYSTEM. ADDITION OF NEW ENTRY VESTIBULE. ALTERATIONS TO EXISTING PLUMBING SYSTEM. ALTERATIONS TO EXISTING ELECTRICAL SYSTEM ADDITION OF NEW AIR CONDITIONING SYSTEM (EXISTING HEATING TO REMAIN) PER PLANS
**ELECTRICAL ONLY PERMIT**ELECTRICAL SERVICE REPLACEMENT
TEMPORARY SERVICE
REPLACE TOTAL 22-WINDOWS