REPAIR INTERIOR WALLS/CEILING
INSUFFICIENT MEANS OF EGRESS
LIMESTONE REPLACEMENT 43 EA, LIMESTONE 42 EA, CRACK EPOXY INJECTION 10 LFT, STONE PATCH 20 SQ FT, TUCKPOINTING 175 L FT, SEALANT REPLACEMENT 25L FT, CLEAN AND PAINT STEEL 10 LFT
ERECT ONE SCAFFOLD FROM 06/05/2019 TO 06/05/2020.
LIMESTONE (107EA), LIMESTONE RESET (34EA) CRACK EPOXY INJECTION (23LF) STONE PATCH (50SF), TUCKPOINTING (4,450LF) SEALANT REPLACEMENT (1100LF) RESET WINDOWS (5EA)
No details available
DOOR W/PANIC HRDWR-200+ ASMBLY
OBSTRUCTIONS IN EXIT WAY
OPEN TYPE VIOLATION
POST APPROVED OCCUPANCY CARD