WRECK AND REMOVE A 2 STORY MASONRY MULTI UNIT RESIDENCE AND A DETACHED FRAME GARAGE
SELF-CERT 2019 CBC: FULL BUILDING PERMIT FOR 3 STORY 2 D.U. BUILDING WITH BASEMENT, FRONT TERRACE AT 1ST STORY, REAR DECK WITH STAIR AT 1ST/2ND/3RD STORIES, FRONT DECK AT 2ND/3RD STORIES, ROOFTOP DECK, ROOFTOP STAIR ENCLOSURE, DETACHED 2 CAR GARAGE WITH ROOFTOP DECK AS PER PLAN (OCCUPANCY GROUP R-5, TYPE VA CONSTRUCTION).CONDITIONAL APPROVAL PER 14A-4-404.13., RELEASE OF FULL WRECKING PERMIT STILL PENDING.
POST OWNER/MANAGERS NAME/#
DEFECTIVE FIXTURES
DEFECTIVE OUTLETS
DEFECTIVE OUTLETS
INSTALL COVERS
APPLIANCE INSIGHT DISCONNECT