REPAIR EXTERIOR STAIR
ARRANGE FOR REINSPECTION REGAR
No details available
PROVIDE
PROVIDE
REMOVE
PROVIDE
PROVIDE
REMOVE
RELOCATE THE PUBLIC ELECTRICAL METER BOX AND ELECTRICAL PANEL FROM THE NOBLEMAN BASEMENT TO THE PUBLIC/BUILDING BASEMENT AT THE SW CORNER
RELOCATE THE PUBLIC ELECTRICAL METER BOX AND ELECTRICAL PANEL FROM THE NOBLEMAN BASEMENT TO THE PUBLIC/BUILDING BASEMENT AT THE SW CORNER
REPAIR EXTERIOR WALL
ROOF RECOVER ONLY - NO STRUCTURAL WORK, TUCKPOINTING - NO STRUCTURAL WORK - 200 SQFT
1HR FLR OVER BSMT, 1 OR 2 DU
INSPECT CONSTRUCTION WORK
FILE BLDG REGISTRATION
POST OWNER/MANAGERS NAME/#
ARRANGE PREMISE INSPECTION
CARB MONOX DETECT IN ASSEMBLY
CARB MONOX DETECT IN ASSEMBLY
REPAIR EXTERIOR DOOR
REPAIR EXTERIOR DOOR
REPAIR INTERIOR STAIR SYSTEM
REPAIR EXTERIOR STAIR
UNINTERRUPTED EXIT AT GRADE
REPAIR INTERIOR STAIR SYSTEM
PARAPET
CHIMNEY CAPPING
UNINTERRUPTED EXIT AT GRADE
REPAIR EXTERIOR WALL
PARAPET
CHIMNEY CAPPING
REPAIR EXTERIOR WALL
GRADE AND DRAIN LOT
POST OWNER/MANAGERS NAME/#
REPAIR EXTERIOR WALL
ARRANGE PREMISE INSPECTION
REPAIR BAY WALL
PROTECT SIDEWALK DURING CONST
PROTECT SIDEWALK DURING CONST
REPAIR BAY WALL
GRADE AND DRAIN LOT
REPAIR EXTERIOR WALL