ARRANGE FOR INSPECTION
No details available
SPR 2019 CBRC: INTERIOR ALTERATIONS TO 3RD AND 4TH FLOOR UNIT 303 WORK INCLUDES ARCHITECTURAL, STRUCTURAL, ELECTRICAL, MECHANICAL AND PLUMBING AS PER PLANS - EXISTING OCCUPANCY R-2, PROPOSED OCCUPANCY R-2.**CERTIFIED CORRECTIONS SUBJECT TO FIELD INSPECTIONS & AUDIT **
No details available
SPR 2019 CBRC: INTERIOR RENOVATION TO UNIT 303. NEW MEZZANINE LEVEL TO INCLUDE BEDROOMS AND BATHROOM TO AN EXISTING DOUBLE HEIGHT SPACE.
SPR 2019 CBRC: INTERIOR RENOVATION TO UNIT 303. NEW MEZZANINE LEVEL TO INCLUDE BEDROOMS AND BATHROOM TO AN EXISTING DOUBLE HEIGHT SPACE.
No details available
SPOT TUCKPOINTING - NO STRUCTURAL WORK - 1000 SQFT AND REMOVE AND REPLACE APPROX (500 BRICKS).
REPAIR EXTERIOR WALL
COVER OUTLETS AND JBS
POST OWNER/MANAGERS NAME/#
EXPOSED WIRING
STOP/REMOVE NUISANCE
MAINTAIN EXIT SIGN ILLUMINATED
ARRANGE PREMISE INSPECTION
NO PERMIT PROJECT SIGN