ARRANGE FOR INSPECTION
SPR CBC 2019 ADU NORTHWEST ZONE; CONSTRUCT A 2 STORY REAR ADU COACH HOUSE WITH A TWO CAR GARAGE (TYPE VA CONSTRUCTION); TO INCLUDE MEP WORK, AS PER ARCHITECTURAL PLANS. NO WORK TO THE EXISTING FRONT 3 STORY MASONRY SINGLE FAMILY RESIDENCE.**CERTIFIED CORRECTIONS SUBJECT TO FIELD INSPECTIONS & AUDIT **
2019 CBRC SELF-CERT. DECONVERT EXISTING 3DU TO SINGLE FAMILY RESIDENCE.NEW REAR FRAME ADDITION WITH PARTIAL NEW FOUNDATION (VA CONSTRUCTION).NEW REAR STEEL DECK.INTERIOR REMODELING FOR EXISTING 2 STORY (3 STORY FOR ZONING PURPOSES) BRICK BUILDING WITH BASEMENT (IIIA CONSTRUCTION)INCLUDING MEP WORK AS PER PLANS
WRECK AND REMOVE FRAME DETACHED GARAGE, NO REPLACEMENT LOCATIONS: 0 RESIDENTIAL UNIT(S), 1 NON-RESIDENTIAL UNIT(S), EXTERIOR WORK
SEE INSPECTOR COMMENTS
SEE INSPECTOR COMMENTS