ARRANGE PREMISE INSPECTION
NO ENTRY
INSTALLATION OF NON-REQUIRED FA SYSTEM PER SECT.#15-16-110 IN A LARGE ASSEMBLY (MORE THEN 1000 OCCUPANT) - SINGLE STORY BUILDING.. A CST IS REQUIRED PER SECT.#15-16-1450. CK#4768;$150.00.
RENOVATION OF AN EXISTING ONE STORY WAREHOUSE BUILDING FOR A TEMPORARY EMPLOYEE TRAINING FACILITY FOR UNITED AIRLINES AS PER PLANS. SCOPE - 103,217 S.F. (JAN 2019 - APRIL 2020)
ARRANGE COMPLETED PERMIT INSP.
GIVE VENT OPENINGS % FL. AREA
APPROVE PLANS ON SITE
PROVIDE MINIMUM VENT QUANTITY
ARRANGE COMPLETED PERMIT INSP.