REPAIR/REPLACEMENT AFFECTING 1 SYSTEMS : 1 CHILLER(VERTIV LIEBERT VS053ASC0EI9DU0, 2ND FLOOR) . ELECTRICAL WORK UNDER THIS PERMIT = NO . LOCATIONS: 0 RESIDENTIAL UNIT(S), 1 NON-RESIDENTIAL UNIT(S), 1 INTERIOR COMMON AREAS, EXTERIOR WORK, SECOND FLOOR & CONDENSING UNIT ON ROOFTOP.
REPAIR/REPLACEMENT AFFECTING 1 SYSTEMS : 1 CHILLER(VERTIV LIEBERT VS053ASC0EI9DU0, 2ND FLOOR) . ELECTRICAL WORK UNDER THIS PERMIT = NO . LOCATIONS: 0 RESIDENTIAL UNIT(S), 1 NON-RESIDENTIAL UNIT(S), 1 INTERIOR COMMON AREAS, EXTERIOR WORK, SECOND FLOOR & CONDENSING UNIT ON ROOFTOP.
SPR 2019 CBRC: REMOVE RTU AND INSTALL NEW RTU AN AT ROOF OF AN EXISTING 3 STORY OFFICE BUILDING. WORK TO INCLUDE ASSOCIATED ELECTRICAL AND DUCTWORK AT ROOF AND 3RD FLOOR AS PER PLANS. (B-BUSINESS, 3B CONSTRUCTION)
CYLINDER REPLACEMENT ON FREIGHT ELEVATOR, 6500LBS CAPACITY, 4 FLOORS, SUBJECT TO CITY OF CHICAGO DEPT. OF BUILDINGS ELEVATOR BUREAU INSPECTION (EV004647).
A TEMPORARY 36 KW GENERATOR WITH A 200 AMP 3 PHASE DISTRIBUTION CENTER TO FEED FOUR (4) SPIDER BOXES FOR A TENT EVENT SCHEDULED FOR SATURDAY, 03/12/2022. INSTALLATION DATE IS THURSDAY, 03/10/2022; REMOVAL DATE IS SATURDAY, 03/12/2022.
GENERATORS FOR STREET FEST
FOUND NO VIOLATIONS AS OF DATE
OPEN TYPE VIOLATION