PERMIT EXPIRES ON 10/28/2025 ERECTION STARTS: 8/23/2025, ERECTION ENDS: 9/5/2025. ARC FEST 2025- STAGE 1STRUCTURES- PEER REVIEW- SELF-CERT- 3 DAY EVENT (8/29/25-8/31/2025)ERECT THIRTEEN (13) STRUCTURES, ONE (1) 96WIDE X44DEEP X 55 STAGE, SIX (6) 8X8.5X40 GANGED UPRIGHT CARGO CONTAINERS, AND SIX (6) 20X8X8.5 3 HIGH STACKED CARGO CONTAINERS.SETUP 8/23/2025 REMOVE 9/5/2025ASSEMBLY
PERMIT EXPIRES ON 10/27/2025 ERECTION STARTS: 8/25/2025, ERECTION ENDS: 9/5/2025. ARC FEST 2025- ART SCULPTURE STRUCTURESTRUCTURE- PEER REVIEW- SELF-CERT- 3 DAY EVENT (8/29/25-8/31/2025)ERECT ONE (1) ART SCULPTURE 51X51X41 OVERALL FOOT PRINT, FOUR (4) TOWERS ON 11.5X11.5 W8 BASE, AND 3- 39.5 DIA RINGSSETUP 8/25/2025 REMOVE 9/5/2025ASSEMBLY
PERMIT EXPIRES ON 10/12/2025 ERECTION STARTS: 8/25/2025, ERECTION ENDS: 9/5/2025. ARC FEST 2025- STRUCTURE LAZER BACKSTOPSTRUCTURE- REINSTATE 101057527- PEER REVIEW- SELF-CERT- 3 DAY EVENT (8/29/25-8/31/2025)ERECT ONE (1) 91 WIDE X14 DEEP X30 TALL RINGLOCK STRUCTURE. SETUP 8/25/2025 REMOVE 9/5/2025ASSEMBLY
PERMIT EXPIRES ON 10/18/2025 ERECTION STARTS: 8/25/2025, ERECTION ENDS: 9/5/2025. ARC FEST 2025- STAGE 4STRUCTURES- PEER REVIEW- REINSTATE 101027622- SELF-CERT- 3 DAY EVENT (8/29/25-8/31/2025)ERECT FIVE (5) STRUCTURES- ONE (1) 82 X 14 X 4 PLATFORM FOOT PRINT, TWO (2) 20 X 4 X15.1 IBC STAKED CONTAINERS, ONE (1) 74 X 12 X4 PLATFORM FOOT PRINT, ONE (1) 23 X 8 DJ TRAILER STAGE.SETUP 8/25/2025 REMOVE 9/5/2025ASSEMBLY
PERMIT EXPIRES ON 10/18/2025 ERECTION STARTS: 8/25/2025, ERECTION ENDS: 9/5/2025. ARC FEST 2025 - STAGE 2 STRUCTURES- PEER REVIEW- REINSTATE 101027906- SELF-CERT- 3 DAY EVENT (8/29/25-8/31/2025)ERECT FOUR (4) STRUCTURES- ONE (1) 56 WIDE X32 DEEP X4 TALL STAGE/PLATFORM WITH DJ BOOTH AND BACK DROP, TWO (2) 222' LONG 12 BOX TRUSS HUNG FROM STRUCTURE TENT AND 198' LONG 12 BOX TRUSS HUNG FROM STRUCTURE TENT.SETUP 8/25/2025 ¿ REMOVE 9/5/2025ASSEMBLY
PERMIT EXPIRES ON 10/18/2025 ERECTION STARTS: 8/23/2025, ERECTION ENDS: 9/5/2025. ARC FEST 2025- PLATFORMSSTRUCTURES- REINSTATE 101058253- PEER REVIEW- SELF-CERT- 3 DAY EVENT (8/29/25-8/31/2025)ERECT 5 STRUCTURES: TWO (2) 92X48, 2, 4, 6 FT ELEVATED PLATFORMS, ONE (1) 112X48, 7, 9, 11 FT ELEVATED PLATFORMS WITH TWO (2) 32X16, 2 FT ELEVATED PLATFORMS.SETUP 8/23/2025 REMOVE 9/5/2025ASSEMBLY
PERMIT EXPIRES ON 10/18/2025 ERECTION STARTS: 8/25/2025, ERECTION ENDS: 9/5/2025. ARC FEST 2025- STAGE 3STRUCTURES- REINSTATE 101057982-PEER REVIEW- SELF-CERT- 3 DAY EVENT (8/29/25-8/31/25)ERECT TEN (10) STRUCTURES- ONE (1) 80 WIDE X36 DEEP X 4STAGE/PLATFORM, ONE (1) 32'X7'X12' BOX TRUSS DJ BOOTH, TWO (2) 13"X13"X34.8" AUDIO TOWER, TWO (2) 15.8'X11.7'X16.8' LIGHT TRUSS TOWER, FOUR (4) 26.9'X11.7'X30.24' LIGHT TRUSS TOWER, SETUP 8/25/2025 ¿ REMOVE 9/5/2025ASSEMBLY
PERMIT EXPIRES ON 10/12/2025 ERECTION STARTS: 8/23/2024, ERECTION ENDS: 9/5/2025. ARC FEST 2025- LARGE TENTSTENTS- PEER REVIEW- REINSTATE 101026056- SELF-CERT- 3 DAY EVENT (8/29/25-8/31/2025)ERECT 3 TENTS: TWO (2) 100X50 (30MX15M) STRUCTURE, ONE (1) 100X230 (30MX70M) STRUCTURE. SETUP 8/25/2025 REMOVE 9/5/2025ASSEMBLY
PERMIT EXPIRES ON 10/12/2025 ERECTION STARTS: 8/25/2025, ERECTION ENDS: 9/5/2025. ARC FEST 2025- SMALL TENTSTENTS- REINSTATE 101026877- SELF-CERT- 3 DAY EVENT (8/29/25-8/31/2025)ERECT 18 TENTS: ONE (1) 10X50 FRAME, ONE (1) 10X80 FRAME, ONE (1) 10X90 FRAME, ONE (1) 10X140 FRAME, SEVEN (7) 20X40 FRAME, THREE (3) 20X60 FRAME, ONE (1) 20X80 FRAME, ONE (1) 40X33 (12MX10M) STRUCTURE, TWO (2) 40X50 (12MX15M) STRUCTURE.SETUP 8/25/2025 REMOVE 9/5/2025ASSEMBLY
LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: UNION PARK.
2019 CBC: INSTALL 21' X 32' SQUASH COURT KIT MADE OF TEMPERED GLASS ON COURT AS PER PLANS. **CERTIFIED PLANS CORRECTIONS: CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTIONS **
PERMIT EXPIRES ON 10/30/2024 ERECTION STARTS: 8/26/2024, ERECTION ENDS: 9/6/2024. ARC FEST 2024- STAGE 3 STRUCTURES- PEER REVIEW- SELF-CERT- 3 DAY EVENT (8/30/24-9/1/2024)ERECT TEN (10) STRUCTURES- ONE (1) 80 WIDE X 36 DEEP X4 STAGE/PLATFORM, ONE (1) 32'X7'X12' BOX TRUSS DJ BOOTH, TWO (2) 13"X13"X34.8" AUDIO TOWER, TWO (2) 15.8'X11.7'X16.8' LIGHT TRUSS TOWER, FOUR (4) 26.9'X11.7'X30.24' LIGHT TRUSS TOWER, SETUP 8/26/2024 REMOVE 9/6/2024ASSEMBLY
PERMIT EXPIRES ON 10/30/2024 ERECTION STARTS: 8/24/2024, ERECTION ENDS: 9/6/2024. ARC FEST 2024- PLATFORMSSTRUCTURES- PEER REVIEW- SELF-CERT- 3 DAY EVENT (8/30/24-9/1/2024)ERECT 5 STRUCTURES: TWO (2) 92X48, 2, 4, 6 FT ELEVATED PLATFORMS, ONE (1) 112X48, 7, 9, 11 FT ELEVATED PLATFORMS WITH TWO (2) 32X16, 2 FT ELEVATED PLATFORMS.SETUP 8/24/2024 REMOVE 9/6/2024ASSEMBLY
PERMIT EXPIRES ON 10/29/2024 ERECTION STARTS: 8/26/2024, ERECTION ENDS: 9/6/2024. ARC FEST 2024- ART SCULPTURESTRUCTURES- PEER REVIEW- SELF-CERT- 3 DAY EVENT (8/30/24-9/1/2024)ERECT ONE (1) 20'X51.8'X34.5" BOX TRUSS PORTAL ART PIECE W/ PLATFORM (1010SF), TWO (2) 21.25' RISE SCULPTURE ART FIGURES (50SF EACH)SETUP 8/26/2024 REMOVE 9/6/2024ASSEMBL
PERMIT EXPIRES ON 10/29/2024 ERECTION STARTS: 8/24/2024, ERECTION ENDS: 9/6/2024. ARC FEST 2024- STAGE 1STRUCTURES- PEER REVIEW- SELF-CERT- 3 DAY EVENT (8/30/24-9/1/2024)ERECT NINE (9) STRUCTURES, ONE (1) 50 WIDE X40 DEEP X 42.5 SAM 575 MOBILE STAGE, TWO (2) 8X8.5X40 UPRIGHT CARGO CONTAINERS, AND SIX (6) 20X8X8.5 4 HIGH STACKED CARGO CONTAINERS.SETUP 8/24/2024 REMOVE 9/6/2024ASSEMBLY
PERMIT EXPIRES ON 10/29/2024 ERECTION STARTS: 8/28/2024, ERECTION ENDS: 9/6/2024. ARC FEST 2024- ART SCULPTURESTRUCTURES- PEER REVIEW- SELF-CERT- 3 DAY EVENT (8/30/24-9/1/2024)ERECT ONE (1) 20'X51.8'X34.5" BOX TRUSS PORTAL ART PIECE W/ PLATFORM (1010SF)SETUP 8/28/2024 REMOVE 9/6/2024ASSEMBLY
PERMIT EXPIRES ON 10/27/2024 ERECTION STARTS: 8/26/2024, ERECTION ENDS: 9/6/2024. ARC FEST 2024- STAGE 2STRUCTURES- PEER REVIEW- REINSTATE 101027906- SELF-CERT- 3 DAY EVENT (8/30/24-9/1/2024)ERECT FOUR (4) STRUCTURES- ONE (1) 56 WIDE X32 DEEP X4 TALL STAGE/PLATFORM WITH DJ BOOTH AND BACK DROP, TWO (2) 222' LONG 12 BOX TRUSS HUNG FROM STRUCTURE TENT AND 198' LONG 12 BOX TRUSS HUNG FROM STRUCTURE TENT.SETUP 8/26/2024 REMOVE 9/6/2024 ASSEMBLY
PERMIT EXPIRES ON 10/27/2024 ERECTION STARTS: 8/26/2024, ERECTION ENDS: 9/6/2024. ARC FEST 2024- STAGE 4 STRUCTURES- PEER REVIEW- REINSTATE 101027622- SELF-CERT- 3 DAY EVENT (8/30/24-9/1/2024)ERECT FIVE (5) STRUCTURES- ONE (1) 82 X14 X4 PLATFORM FOOT PRINT, TWO (2) 20 X 4 X 15.1 IBC STAKED CONTAINERS, ONE (1) 74 X12 X4 PLATFORM FOOT PRINT, ONE (1) 23 X 8 DJ TRAILER STAGE.SETUP 8/26/2024 REMOVE 9/6/2024 ASSEMBLY
PERMIT EXPIRES ON 10/27/2024 ERECTION STARTS: 8/26/2024, ERECTION ENDS: 9/6/2024. ARC FEST 2024- STRUCTURE LASER BACKSTOPSTRUCTURE- PEER REVIEW- SELF-CERT- 3 DAY EVENT (8/30/24-9/1/2024) ERECT ONE (1) 91 WIDE X14 DEEP X30 TALL RINGLOCK STRUCTURE. SETUP 8/26/2024 - REMOVE 9/6/2024 ASSEMBLY
PERMIT EXPIRES ON 10/19/2024 ERECTION STARTS: 8/19/2024, ERECTION ENDS: 8/19/2024. PERMIT EXPIRES ON 10/16/2024 SELF CERT. CBC2019 -MOBILE STAGE FOR THE MARCH ON THE DNC 2024 INC.AT UNION PARK EVENT ON AUG 19. 1 - 20X24 SL100 MOBILE STAGE WITH WINGS. MARCH ON THE DNC 2024 INC WITH PATINOS MUSIC.
GROUNDING AND FINAL CONNECTIONS OF 56KV TEMP GENERATOR @ UNION PARK FOR ORGANIZED PROTEST AGAINST THE ISRAELI GAZA WAR
INSTALL & MANAGE CABLE FOR TEMPORARY POWER FOR ARC MUSIC FESTIVAL. INSTALL CABLE FROM GENERATOR TO NEXT DEVICE. INSTALL GROUND RODS FOR GROUNDING OF GENERATORS
PERMIT EXPIRES ON 10/09/2024 ERECTION STARTS: 8/26/2024, ERECTION ENDS: 9/6/2024. ARC FEST 2024- LARGE TENTS TENTS- PEER REVIEW- REINSTATE 101026056- SELF-CERT- 3 DAY EVENT (8/30/24-9/1/2024)ERECT 3 TENTS: TWO (2) 100X50 (30MX15M) STRUCTURE, ONE (1) 100X230 (30MX70M) STRUCTURE. SETUP 8/26/2024 ¿ REMOVE 9/6/2024ASSEMBLY
PERMIT EXPIRES ON 10/09/2024 ERECTION STARTS: 8/26/2024, ERECTION ENDS: 9/6/2024. ARC FEST 2024- SMALL TENTSTENTS- REINSTATE 101026877- SELF-CERT- 3 DAY EVENT (8/30/24-9/1/2024)ERECT 18 TENTS: ONE (1) 10X50 FRAME, ONE (1) 10X80 FRAME, ONE (1) 10X90 FRAME, ONE (1) 10X140 FRAME, SEVEN (7) 20X40 FRAME, THREE (3) 20X60 FRAME, ONE (1) 20X80 FRAME, ONE (1) 40X33 (12MX10M) STRUCTURE, TWO (2) 40X50 (12MX15M) STRUCTURE.SETUP 8/26/2024 ¿ REMOVE 9/6/2024ASSEMBLY
MALKO W ILL SUPPORT THE LOW VOLTAGE INSTALLATION WITH PITCHFORK THROUGHOUT THE VENUE TO SUPPLY CONNECTIVITY TO POINTS OF SALE LOCATIONS, TEMP OFFICES AND CCTV.
INSTALL & MANAGE CABLE FOR TEMPORARY POWER AT PITCHFORK. INSTALL CABLE FROM GENERATOR TO NEXT DEVICE. INSTALL GROUND RODS FOR GROUNDING OF GENERATORS.
PERMIT EXPIRES ON 09/09/2024 ERECTION STARTS: 7/15/2024, ERECTION ENDS: 7/22/2024. SELF CERT - CBC2019 - 2024 PITCHFORK MUSIC FESTIVAL LARGE TENT ON JULY 19-21. 1- 82X98 TENT. AT PLUTO LLC.
PERMIT EXPIRES ON 09/01/2024 ERECTION STARTS: 7/15/2024, ERECTION ENDS: 7/22/2024. SELF CERT. CBC2019 - REINSTATEMENT OF 2023 PERMIT 101022358 FOR THE 2024 PITCHFORK MUSIC FESTIVAL MOBILE STAGES AT UNION PARK ON JULY 19-21. SAME 3 STAGES: 1- 50X40 MEGASTAGE MOBILE STAGE WITH WINGS AND THRUST, 1- 50X40 SAM 575 MOBILE STAGE WITH WINGS, AND 1-SL250 32X24 MOBILE STAGE WITH WINGS. AT PLUTO LLC.
PERMIT EXPIRES ON 09/01/2024 ERECTION STARTS: 7/15/2024, ERECTION ENDS: 7/22/2024. SELF CERT - CBC2019 - 2024 PITCHFORK MUSIC FESTIVAL SMALL TENTS AT UNION PARK ON JULY 19-21. 2 - 24X32 FOH SCAFFOLD VIP VIEWING STRUCTURES, 2 - 10X80, 1-10X290, 1-10X70, 1-20X40, AND 1-30X50 TENTS. AT PLUTO LLC.
PERMIT EXPIRES ON 10/24/2023 PERMIT EXPIRES ON 10/23/2023 ERECTION STARTS: 8/27/2023, ERECTION ENDS: 9/7/2023. ARC FEST 2023- STAGE 2 STRUCTURES- PEER REVIEW - SELF-CERT- 3 DAY EVENT (9/1-3/2023)ERECT FOUR (4) STRUCTURES- ONE (1) 56' WIDE X 32" DEEP X 4'TALL STAGE/PLATFORM WITH DJ BOOTH AND BACK DROP, TWO (2) 222' LONG 12" BOX TRUSS HUNG FROM STRUCTURE TENT AND 198' LONG 12" BOX TRUSS HUNG FROM STRUCTURE TENT.SETUP 8/27/2023 REMOVE 9/7/2023 ASSEMBLY
PERMIT EXPIRES ON 10/24/2023 ERECTION STARTS: 8/23/2023, ERECTION ENDS: 9/7/2023. ARC FEST 2023- LARGE TENTS TENTS- PEER REVIEW- SELF-CERT- 3 DAY EVENT (9/1-3/2023)ERECT 3 TENTS: TWO (2) 100X50 (30MX15M) STRUCTURE, ONE (1) 100X230 (30MX70M) STRUCTURE. SETUP 8/23/2023 REMOVE 9/7/2023 ASSEMBLY
PERMIT EXPIRES ON 10/23/2023 ERECTION STARTS: 8/23/2023, ERECTION ENDS: 9/7/2023. ARC FEST 2023- STAGE 1 STRUCTURES- PEER REVIEW- SELF-CERT- 3 DAY EVENT (9/1-3/2023) ERECT SEVEN (7) STRUCTURES, ONE (1) 131 WIDE X 72 X20 FOUR(4) 4 HIGH AND TWO (2) 3 HIGH 8' X 20' STACKED CARGO CONTAINERS FLANKING STAGE.SETUP 8/23/2023 REMOVE 9/7/2023 ASSEMBLY
PERMIT EXPIRES ON 10/23/2023 ERECTION STARTS: 8/27/2023, ERECTION ENDS: 9/7/2023. ARC FEST 2023- STAGE 4STRUCTURES- PEER REVIEW- SELF-CERT- 3 DAY EVENT (9/1-3/2023)ERECT FIVE (5) STRUCTURES- ONE (1) 82'X14'X4' PLATFORM FOOT PRINT, TWO (2) 20'X4'X15.1' IBC STAKED CONTAINERS, ONE (1) 74'X12'X4' PLATFORM FOOT PRINT, ONE (1) 23'X8' DJ TRAILER STAGE. SETUP 8/23/2023 REMOVE 9/7/2023ASSEMBLY
PERMIT EXPIRES ON 10/23/2023 ERECTION STARTS: 8/27/2023, ERECTION ENDS: 9/7/2023. ARC FEST 2023- STRUCTURE LASER BACKDROP STRUCTURE- PEER REVIEW- SELF-CERT- 3 DAY EVENT (9/1-3/2023) ERECT ONE (1) 88 WIDE X 16 DEEP X30 TALL RINGLOCK STRUCTURE. SETUP 8/27/2023 REMOVE 9/7/2023 ASSEMBLY **CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTION***
PERMIT EXPIRES ON 10/22/2023 ERECTION STARTS: 8/27/2023, ERECTION ENDS: 9/7/2023. ARC FEST 2023 - STAGE 3 STRUCTURES - PEER REVIEW - SELF-CERT - 3 DAY EVENT (9/1-3/2023) ERECT EIGHT (8) STRUCTURES - ONE (1) 40' WIDE X 32' DEEP X 20' TALL STAGE/PLATFORM, WITH ONE (1) 30' WIDE X 20' BOX TRUSS ARCH, ONE (1) 25' WIDE X 20' BOX TRUSS ARCH, ONE (1) 20' WIDE X 20' BOX TRUSS ARCH, ONE (1) 15' WIDE 20' BOX TRUSS ARCH; FOUR (4) 12' X 12' X 23.5' SPEAKER ARRAY; TWO (2) 24' X 16'X 3' SEATING PLATFORMS WITH
PERMIT EXPIRES ON 10/16/2023 ERECTION STARTS: 8/23/2023, ERECTION ENDS: 9/7/2023. ARC FEST 2023- PLATFORMSSTRUCTURES- PEER REVIEW- SELF-CERT- 3 DAY EVENT (9/1-3/2023)ERECT 3 STRUCTURES: TWO (2) 80X48, 2, 4, 6 FT ELEVATED PLATFORMS, ONE (1) 92X48, 7, 9, 11 FT ELEVATED PLATFORMS SETUP 8/23/2023 REMOVE 9/7/2023ASSEMBLY
PERMIT EXPIRES ON 10/09/2023 ERECTION STARTS: 8/23/2023, ERECTION ENDS: 9/7/2023. ARC FEST 2023- SMALL TENTSTENTS- SELF-CERT- 3 DAY EVENT (9/1-3/2023)ERECT 18 TENTS: ONE (1) 10X50 FRAME, ONE (1) 10X80 FRAME, ONE (1) 10X90 FRAME, ONE (1) 10X140 FRAME, SEVEN (7) 20X40 FRAME, THREE (3) 20X60 FRAME, ONE (1) 20X80 FRAME, ONE (1) 40X33 (12MX10M) STRUCTURE, TWO (2) 40X50 (12MX15M) STRUCTURE.SETUP 8/23/2023 ¿ REMOVE 9/7/2023ASSEMBLY
PERMIT EXPIRES ON 09/17/2023 ERECTION STARTS: 7/17/2023, ERECTION ENDS: 7/25/2023. PITCHFORK- LARGE TENTTENT- PEER REVIEW- SELF-CERT- 3 DAY EVENT (7/21/23-7/23/23) ERECT ONE (1) TENTS, ONE (1) 82X99 (25MX30M) STRUCTURE TENT.SETUP 7/11/22- REMOVE 7/18/22 ASSEMBLY
TEMP POWER FOR PITCHFORK MUSIC FESTIVAL
TEMP POWER FOR ARC MUSIC FEST.
PERMIT EXPIRES ON 09/06/2023 ERECTION STARTS: 7/17/2023, ERECTION ENDS: 7/25/2023. PITCHFORK- SMALL TENTSTENT- SELF-CERT- 3 DAY EVENT (7/21/23-7/23/23) ERECT SIX (6) TENTS, ONE (1) 10X70 FRAME TENT, TWO (2) 10X80 FRAME TENT, ONE (1) 10X290 FRAME TENT, ONE (1) 20X40 FRAME TENT, AND ONE (1) 30X32 (9MX10M) STRUCTURE TENT.SETUP 7/11/22- REMOVE 7/18/22 ASSEMBLY
PERMIT EXPIRES ON 09/05/2023 ERECTION STARTS: 7/17/2023, ERECTION ENDS: 7/25/2023. SELF CERT. 2023 PITCHFORK MUSIC FESTIVAL MOBILE STAGES AT UNION PARK. STAGES: 1- 50X40 MEGASTAGE MOBILE STAGE WITH WINGS AND THRUST, 1- 50X38 SAM 575 MOBILE STAGE WITH WINGS, AND 1-SL250 32X24 MOBILE STAGE WITH WINGS. AT PLUTO LLC.
PERMIT EXPIRES ON 11/01/2022 ERECTION STARTS: 8/25/2022, ERECTION ENDS: 9/8/2022. TENTS- PEER REVIEW- SELF-CERT- 3 DAY EVENT (9/2-4/2022)ARC FEST 2022- LARGE TENTS ERECT 3 TENTS: TWO (2) 100X50 (30MX15M) STRUCTURE, ONE (1) 100X200 (30MX60M) STRUCTURE. SETUP 8/25/2022 REMOVE 9/8/2022 ASSEMBLY
PERMIT EXPIRES ON 11/01/2022 ERECTION STARTS: 8/25/2022, ERECTION ENDS: 9/8/2022. STAGES- PEER REVIEW- SELF-CERT- 3 DAY EVENT (9/2-4/2022)ARC FEST 2022- STAGES AND PLATFORMS ERECT 13 STRUCTURES: ONE (1) 50X40X6 MOBILE STAGE, SAM 575, W/ 20X40 STAGE RIGHT AND STAGE LEFT, 72X12 UPSATGE, AND SIX(6) SEPARATE 8X20 STACKED 3 HIGH CARGO CONTAINERS FLANKING STAGE; ONE (1) 64X32, 4 ELEVATED PLATFORM, W/ 8X12 STAGE RIGHT AND STAGE LEFT; ONE (1) 48X32, 4 ELEVATED PLATFORM W/ 20X20 STAGE LEFT, 4 DELAY TOWE
PERMIT EXPIRES ON 10/31/2022 ERECTION STARTS: 8/19/2022, ERECTION ENDS: 8/22/2022. SELF CERT. 2022 RUIDO FEST TENTS AT UNION PARK. 1-20X40, 1-10X90, 1-10X200 AND 1-40X60 TENTS. RUIDO COMPANY LLC WITH LAKESHORE ATHLETIC SERVICES INC. **** SELF CERTIFICATION **** CONDITIONAL APPROVAL **** SUBJECT TO FIELD INSPECTION **** AOR CERTIFICATE OF INSPECTION REQUIRED ****
PERMIT EXPIRES ON 10/31/2022 ERECTION STARTS: 8/25/2022, ERECTION ENDS: 9/8/2022. TENTS- SELF-CERT- 3 DAY EVENT (9/2-4/2022)ARC FEST 2022- SMALL TENTS ERECT 18 TENTS: ONE (1) 10X60 FRAME, ONE (1) 20X30 FRAME, TEN (10) 20X40 FRAME, ONE (1) 20X60 FRAME, ONE (1) 20X80 FRAME, ONE (1) 20X100 FRAME, ONE (1) 30X40 FRAME, ONE (1) 40X40 FRAME, ONE (1) 40X40 (12MX12M) STRUCTURE.SETUP 8/25/2022 REMOVE 9/8/2022 ASSEMBLY **** SELF CERTIFICATION **** CONDITIONAL APPROVAL **** SUBJECT TO FIELD INSPECTION **
PERMIT EXPIRES ON 10/31/2022 ERECTION STARTS: 8/19/2022, ERECTION ENDS: 8/22/2022. SELF CERT. 2022 RUIDO FEST - MONACO STRUCTURE AT UNION PARK. 1- 30X30 OPEN STRUCTURE. ATOMIC BRANDS INC WITH TECHNOTRIX.**** SELF CERTIFICATION **** CONDITIONAL APPROVAL **** SUBJECT TO FIELD INSPECTION **** AOR CERTIFICATE OF INSPECTION REQUIRED ****
PERMIT EXPIRES ON 10/31/2022 ERECTION STARTS: 8/25/2022, ERECTION ENDS: 9/8/2022. STRUCTURES- PEER REVIEW- SELF-CERT- 3 DAY EVENT (9/2-4/2022)ARC FEST 2022- PLATFORMS ERECT 3 STRUCTURES: TWO (2) 80X48, 2, 4, 6 FT ELEVATED PLATFORMS, ONE (1) 100X48, 7, 9, 11 FT ELEVATED PLATFORM SETUP 8/25/2022 REMOVE 9/8/2022ASSEMBLY
TEMP POWER FOR ARC MUSIC FESTIVAL
INSPECTION FEES