TUCKPOINTING WASHED OUT MORTAR JOINTS ON SOUTH ELEVATION.REMOVE/REPLACE SPALLED BRICK AS NEEDED ON ALL 4 LEVEL OF THE BUILDINGS. - NO STRUCTURAL WORK - 1 SQFT, WORK TO BE COMPLETED ON SOUTH AND WEST ELEVATIONS, SEPARATE EVIRONMENTAL PERMIT FOR GRINDING REQ'D
ERECT ONE (1) SCAFFOLD DATES 04/21/2023 THROUGH 04/21/2024
No details available
No details available
MAINTAIN OR REPAIR ELECT ELEVA
No details available
No details available
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
REPAIR OR REPLACE
REPAIR OR REPLACE
ACCESS TO ROOF
ARRANGE FOR INSPECTION
FOUND NO VIOLATIONS AS OF DATE
ARRANGE FOR INSPECTION
ACCESS TO ROOF
TEST G & S PASS ELE