REPAIR INTERIOR WALLS/CEILING
EXIT THROUGH BEDROOM/BATHROOM
OBSTRUCTIONS IN EXIT WAY
REPAIR INTERIOR WALLS/CEILING
1HR SEP-D.U. AND REST OF BLDG
1HR SEP-D.U. AND REST OF BLDG
EXIT THROUGH BEDROOM/BATHROOM
OBSTRUCTIONS IN EXIT WAY
ARRANGE PREMISE INSPECTION
REPAIR LINTELS