OBSTRUCTIONS IN EXIT WAY
OBSTRUCTIONS IN EXIT WAY
INSTALL ONE ALUMINIUM INTERNALLY ILLUMINATED SIGN CABINET WITH ACRYLIC PUSH THRU COPY MOUNTED TO BUILDING FACADE WEST ELEVATION FACING WABASH AVE (J75558_FLG-01_DSJ)
REPLACEMENT OF RTU, WITH ONE AAON 30 TON ROOFTOP UNIT, SELF CONTAINED, AIR COOLED, R410A. PRESSURE RELIEF VALVE(S) REQUIRED ON UNIT.
REPLACE (1) ROOF TOP UNIT.
POST APPROVED OCCUPANCY CARD
OBSTRUCTIONS IN EXIT WAY
INTERIOR FINISH FIRERESISTANCE
1-HR STAIR ENCLOSURE, <3 STORY
1-HR STAIR ENCLOSURE, <3 STORY
INTERIOR FINISH FIRERESISTANCE
POST APPROVED OCCUPANCY CARD
MAINTAIN OR REPAIR ELECT ELEVA
ARRANGE FOR INSPECTION
ACCESS TO ROOF
REPAIR EXTERIOR WALL
SERVICE WALK, PASSAGE, AREAWAY
COVER OUTLETS AND JBS
STOP/REMOVE NUISANCE
FLAKY INTERIOR PAINT
REPAIR EXTERIOR PLATFORM
REPAIR EXTERIOR STAIR
REPAIR AREAWAY WALL
OBSTRUCTIONS IN EXIT WAY
ARRANGE FOR INSPECTION
ARRANGE FOR INSPECTION