CONCRETE MASONRY REPAIR / REPLACEMNT: 100SQ. FT., EXCAVATION = NO. LOCATION: FLOORS 8-11 (MISC. CONCRETE REPAIRS).
TEMPORARY SCAFFOLDING: QTY: 2, MAX. LENGTH: 244 FT., MAX. HEIGHT: 120 FT. LOCATION: NORTH ELEVATION. PERMIT EXPIRATION DATE: 365 DAYS FROM PERMIT ISSUED DATE THIS PERMIT IS NOT VALID WITHOUT CORRESPONDING CDOT PUBLIC WAY PERMIT.
GENERAL MAINTENANCE FEBRUARY 2024
REPLACE HOIST ROPES ON THREE (3) 2500LB.CAP, 11-FLOORS, 350 FPM, GEARED TRACTION PASENGER ELEVATORS #1, #2, & #3. PURSUANT TO THE SCOPE OF WORK SUBMITTED. EV001946
GENERAL MAINTENANCE JANUARY 2024
GENERAL MAINTENANCE DECEMBER 2023
GENERAL MAINTENANCE NOVEMBER 2023
GENERAL MAINTENANCE SEPTEMBER 2023
GENERAL MAINTENANCE SEPTEMBER 2023
ERECT ONE (1) SCAFFOLD DATES 07/24/2023 THROUGH 07/24/2024
PARKING STRUCTURE MAINTENANCE: 395 SQFT PARTIAL DEPTH REPAIRS, ROUT AND SEAL 1000 L FT, JOINT SEALANT REPLACEMENT 1205 L FT, REPLACE 91,500 SQ FT TRAFFIC TOPPING, 45 SQ FT CONCRETE FACADE REPAIR
INSTALLATION OF CAMARA AND ADDITIONAL TRAVELING CABLES ON THREE(3) 2500LB CAPACITY, 350FPM, 11-FLOOR, PASSENGER ELEVATORS, PURSUANT TO THE SCOPE OF WORK ON JOBSITE AT TIME OF INSPECTION.(EV001946)
GENERAL BUILDING MAINTENANCE FOR SEPTEMBER 2022
GENERAL BUILDING MAINTENANCE AUGUST ,2022
GENERAL BUILDING MAINTENANCE FOR OCTOBER, 2022
GENERAL MAINTENANCE FOR JUNE, 2022
GENERAL MAINTENANCE DECEMBER 2022
GENERAL MAINTENANCE NOVEMBER 2022
GENERAL MAINTENANCE FEBRUARY 2023
GENERAL MAINTENANCE DECEMBER 2022
GENERAL MAINTENANCE MAY 2023
GENERAL MAINTENANCE APRIL 2023
GENERAL MAINTENANCE MARCH 2023
GENERAL MAINTENANCE JANUARY 2023
430 SQ FT OF CMU BLOCK REPLACEMENT AND REPLACING THE ASPHALT SHINGLE SYSTEM ON THE ROOF; REPLACING METAL STAIRS AND RAILINGS IN THE GARAGE *CURRENT ONGOING EXTERIOR WALL REPORT IS VALID THROUGH 11/1/22, AND AN UPDATED ONGOING REPORT WILL BE DUE AFTER THAT DATE*
GENERAL MAINTENANCE FOR JULY 2022
CONCRETE REPAIRS ONLY TO INCLUDE PATCHING OF CONCRETE COLUMNS, WALLS, FLOORS AND CEILINGS (APPROX. 2,000SF) ON LEVELS 1 THRU 10, AND REMOVE AND REPLACE WATERPROOF TRAFFIC COATING ON LEVELS 1-10 OF PARKING GARAGE (APPROX. 6,800SF) - NO STRUCTURAL WORK
GENERAL MAINTENANCE FOR MAY, 2022
GENERAL MAINTENANCE FOR APRIL, 2022
GENERAL BUILDING MAINTENANCE MARCH 2022
SECURITY SYSTEM WORK (GARAGE CAMERA ADDS) (CXSU220223A)
GENERAL BUILDING MAINTENANCE FEBRUARY 2022
GENERAL BUILDING MAINTENANCE DECEMBER, 2021
GENERAL BUILDING MAINTENANCE NOVEMBER, 2021
GENERAL BUILDING MAINTENANCE OCTOBER, 2021
GENERAL MAINTENANCE FOR SEPTEMBER, 2021
GENERAL MAINTENANCE FOR AUGUST, 2021
BUILDING MAINTENANCE FOR JULY, 2021
GENERAL BUILDING MAINTENANCE JUNE, 2021
GENERAL BUILDING MAINTENANCE MAY 2021
SECURITY SYSTEM WORK (GARAGE ROOF TOP CAMERAS) (CXSO210519A)
SECURITY SYSTEM WORK (NMH 1F ELEVATOR LOBBY AT GARAGE CAMERA) (CXSO210518D)
GENERAL BUILDING MAINTENANCE APRIL 2021
GENERAL BUILDING MAINTENANCE MARCH, 2021
GENERAL BUILDING MAINTENANCE FEBRUARY 2021
GENERAL BUILDING MAINTENANCE JANUARY, 2021
GENERAL BUILDING MAINTENANCE DECEMBER 2020
GENERAL BUILDING MAINTENANCE NOVEMBER 2020
GENERAL BUILDING MAINTENANCE 10/2020
MAINTAIN OR REPAIR ELECT ELEVA