REPAIR SCREENS
SCREEN OUTER DOORS, WINDOWS
ARRANGE FOR REINSPECTION REGAR
PROVIDE GUARD RAIL 42 IN HIGH
1HR SEP-D.U. AND REST OF BLDG
1-HR STAIR ENCLOSURE, <3 STORY
REPAIR PORCH SYSTEM
FLAM LIQ TANK FRONTAGE CONSENT
REPLACE DEFECTIVE PLBG FIXTURE
REPAIR EXTERIOR WALL
PARAPET
REPAIR FLOOR
REPAIR EXTERIOR DOOR
REPAIR EXTERIOR STAIR
REPAIR OR REPLACE
OBSTRUCTIONS IN EXIT WAY
REPAIR INTERIOR WALLS/CEILING
REPAIR INTERIOR WALLS/CEILING
OBSTRUCTIONS IN EXIT WAY
DEBRIS, EXCESSIVE
PARAPET
ARRANGE PREMISE INSPECTION
MAINTAIN WINDOW
REPAIR PORCH SYSTEM
REPAIR WINDOW SILLS
PROVIDE DEADLOCK FOR ENTRANCE
STOP/REMOVE NUISANCE
ARRANGE PREMISE INSPECTION
REPAIR EXTERIOR STAIR
CARB MONOX DETECT IN RESID
REPAIR EXTERIOR STAIR
ARRANGE PREMISE INSPECTION
RESTORE EXIT AND EM
WINDOW OPEN EASILY, STAY OPEN
REPAIR PORCH SYSTEM
PROVIDE GUARD RAIL 42 IN HIGH
OBSTRUCTIONS IN EXIT WAY
STOP/REMOVE NUISANCE
REPAIR DOOR, INT.
WINDOW REPAIR FOR AIR SEEPAGE
REPAIR DOOR FRAME, MULLION
CARB MONOX DETECT IN RESID
REPAIR DOOR FRAME, MULLION
FILE BLDG REGISTRATION
REPAIR DOOR, INT.
RESTORE EXIT AND EM
POST OWNER/MANAGERS NAME/#
REPAIR PORCH SYSTEM
REPAIR PORCH SYSTEM
REPAIR PORCH SYSTEM