INSTALLATION OF ONE(1) 750LB CAPACITY, 9FPM, VERTICAL PLATFORM LIFT, W/ ADA PHONE, PURSUANT TO THE SCOPE OF WORK PLANS SUBMITTED.
INSTALLATION OF ONE(1) 750LB CAPACITY, 9FPM, VERTICAL PLATFORM LIFT, W/ ADA PHONE, PURSUANT TO THE SCOPE OF WORK PLANS SUBMITTED.
SPR 2019 CBRC: RENOVATION TO EXISTING 3-STORY RESIDENTIAL BUILDING WITH 13 UNITS. ALTERATION LEVEL 1. PRIVATELY OWNED, PRIVATELY FINANCED ALTERATION INCLUDING REPLACEMENT OF EXISTING FINISHES, PLUMBING FIXTURES REPLACEMENT WITH LOW FLOW FIXTURES, ENERGY EFFICIENT LIGHTING, AND NEW KITCHENS. NO STRUCTURAL SCOPE. (OCCUPANY GROUP: R-2; CONSTRUCTION TYPE IIIA)
ARRANGE PREMISE INSPECTION
ARRANGE PREMISE INSPECTION
REPAIR/REPLACE SMOKE DETECTORS
REPAIR/REPLACE SMOKE DETECTORS
REPAIR ROOF
REPAIR ROOF
ARRANGE PREMISE INSPECTION
REPAIR INTERIOR WALLS/CEILING
REPAIR INTERIOR WALLS/CEILING
INT WALL/CEILING PEELING PAINT
INT WALL/CEILING PEELING PAINT
INT WALL/CEILING PEELING PAINT
REPAIR INTERIOR WALLS/CEILING