SPR 2019 CBC. INTERIOR RENOVATION OF EXISTING 3 STORY 18 DWELLING UNIT MASONRY BUILDING. ELECTRICAL AND PLUMBING INCLUDED. ALL WORK AS PER PLANS.
TUCKPOINT AND REPLACE LINTELS W/ 5" X 5" X 1/4" STEEL ANGLE, FLASHING, AND WEEP HOLES AND THE OUTER WYTHE OF BRICK REPLACE AT NORTH, EAST, SOUTH AND WEST ELEVATIONS; REBUILD 9" THINK PARAPET WALL AT ENTIRE INTERIOR COURTYARD, REINSTALL CONCRETE COPING WITH NEW FLASHING AND WEEP HOLES FOR THE REBUILT PARAPET WALL WITH NEW OUTHER WYTHE BRICK TO MATCH
SEAL BREECHNG AT CHMNY-HWH
OWNER OR LICENSED CONTRACTOR
SAFE WORKING CONDITIONS
PROVIDE COLD WATER TO FICTURES
CARB MONOX DETECT IN RESID
HEAT UNIT ADEQUATELY
INSTALL SMOKE DETECTORS
WINDOW REPAIR FOR AIR SEEPAGE
SUPPLY HOT WTR MIN TEMP 120DEG
UNAPPROVED HEATING DEVICE
OWNER OR LICENSED CONTRACTOR
NO ENTRY
REPAIR SCREENS
NO POSTED ADDRESS
FILE BLDG REGISTRATION
REPAIR EXTERIOR DOOR, RESET
HEAT UNIT ADEQUATELY
SUPPLY HOT WTR MIN TEMP 120DEG
INSTALL SMOKE DETECTORS
UNAPPROVED HEATING DEVICE
INSTALL SMOKE DETECTORS
HEAT UNIT ADEQUATELY
INSTALL GROUNDING OUTLETS
DEFECTIVE DISTRIBUTION
SYSTEM III
SEE INSPECTOR COMMENTS
INSTALL COVERS
PROPER SIZE GRD ELECTRODE COND
REPAIR PORCH SYSTEM
ARRANGE PREMISE INSPECTION
OBSTRUCTIONS IN EXIT WAY