POST APPROVED OCCUPANCY CARD
ALTERATION OF EXISTING COMMUNICATION EQUIPMENT. ALTERATION OF 0 BOXES AND EQUIPMENT ON 1 TOWERS / STRUCTURES. LOCATION: MODIFICATION-EXISTING ANTENNA FACILITY PER PLANS.
No details available
No details available
No details available
No details available
No details available
VERIZON WIRELESS PROPOSED NEW ANTENNA INSTALLATION ON EXISTING BUILDING TO INCLUDE 8 ANTENNAS AND ASSOCIATED EQUIPMENT (EQUIPMENT SPACE INTERIOR) PER PLANS. VZW - 632068 ROYAL SONEST CHICAGO RIVER FRONT
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
HOIST ROPE REPLACEMENT ON ONE (1) 2500LB.CAP, 125 FPM, 39- FLOOR, GEARLESS TRACTION PASSENGER ELEVATOR # 2. PURSUANT TO THE SCOPE OF WORK SUBMITTED. EV007175
CANOPY SIGN
No details available
INSTALLATION OF NEW SMOKE SENSING DEVICE PROVIDED BY OTHERS ON FOUR(4) 2500LB CAPACITY, 39-FLOOR, 500FPM, PASSENGER(CARS #1-4) & ONE(1) 2500LB CAPACITY, 39-FLOOR, 700FPM, PASSENGER/SERVICE(CAR #5), PURSUANT TO THE SCOPE OF WORK SUBMITTED.(EV007175)
No details available
REVISION TO PERMIT #100888666 & #100888650 TO CHANGE PLUMBING CONTRACTOR TO AMS MECHANICAL SYSTEMS, INC
ERECT TWO(2)SCAFFOLDS FROM 03/04/2021 TO 03/04/2022.
SELF CERT 2019 - THE INTERIOR ONLY RENOVATION PROJECT WILL RENOVATE 332 GUESTROOMS AND 24 CORRIDORS AT THE ROYAL SONESTA CHICAGO HOTEL. THE EXISTING OCCUPANCY GROUP IS R-1 - RESIDENTIAL, HOTEL, AND WILL REMAIN UNCHANGED. THE WORK WILL INCLUDE DEMOLITION/CONSTRUCTION OF INTERIOR PARTITIONS, CASEWORK, AND FINISHES. MODIFICATIONS WILL ADDRESS QUANTITY AND DISPERSION OF GUESTROOMS WITH MOBILITY AND/OR COMMUNICATION FEATURES. THE WORK WILL MODIFY THE EXISTING PLUMBING, MECHANICAL, ELECTRICAL, AND FIR
RENOVATION OF 4 FLOORS OF PUBLIC SPACES IN AN EXISTING HOTEL, WORK INCLUDES MINIMAL REMOVAL AND INSTALLATION OF INTERIOR WALLS AND ASSOCIATED CONSTRUCTION. WORK ALSO INCLUDES ALL REQUIRED MECHANICAL, PLUMBING, AND ELECTRICAL WORK AS WELL AS REQUIRED ACCESSIBILITY MODIFICATIONS AS PER PLANS. ** SPR 2019 CBC **
MAINTAIN OR REPAIR ELECT ELEVA
THIS PROJECT IS AN INTERIOR MODEL ROOM AND CORRIDOR RENOVATION OF TWO EXISTING GUEST SUITES (ROOMS 810 AND 2504); ONE MODEL BATH ROOM (ROOM 2501-TUB TO SHOWER CONVERSION) AND A MODEL CORRIDOR-(PORTION OF THE 25TH FLOOR CORRIDOR) AT THE ROYAL SONESTA HOTEL IN CHICAGOTHE PROJECT INCLUDES REMOVAL OF EXISTING FF AND E AND REPLACEMENT WITH NEW BRAND APPROVED FF AND E, NEW DOORS ¿(INCLUDING CONNECTING DOOR FROM 2504 TO ROOM 2503), LIGHT FIXTURES AND MINIMAL REWORK OF LIVING ROOM CLOSET WALL IN GUEST
No details available
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
No details available
No details available
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
No details available
No details available
DOOR W/PANIC HRDWR-200+ ASMBLY
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA