No details available
No details available
REPLACE GOVERNOR CABLE ON ONE (1) 3000LB.CAP, 700 FPM, 46 FLOORS, GEARLESS TRACTION PASSENGER ELEVATOR #3. PURSUANT TO THE SCOPE OF WORK SUBMITTED.101046816
CONCRETE MASONRY REPAIR / REPLACEMNT: 100SQ. FT., EXCAVATION = . LOCATION: ALL ELEVATIONS.
TEMPORARY SCAFFOLDING: QTY: 3, MAX. LENGTH: 180 FT., MAX. HEIGHT: 470 FT. LOCATION: ALL ELEVTIONS. PERMIT EXPIRATION DATE: 365 DAYS FROM PERMIT ISSUED DATE
NEW HEAT PUMP OR REFRIGERATION EQUIP., ELECTRICAL WORK UNDER THIS PERMIT = YES . LOCATIONS: 0 RESIDENTIAL UNIT(S), 0 NON-RESIDENTIAL UNIT(S), 2 INTERIOR COMMON AREAS, EXTERIOR WORK, 16TH FLOOR COMMON AREAS.
INSTALLATION OF GLIDE P OPERATOR ON SIX (6) PASSENGER ELEVATORS. GEARLESS TRACTION #1-#3 3000LB.CAP, 46-FLOORS, #4 3000LB.CAP, 47-FLOORS. HYDRAULIC #5-#6 3500LB.CAP, 6-FLOOR, 150 FPM. PURSUANT TO THE SCOPE OF WORK SUBMITTED. 100039027
ERECT ONE (1) SCAFFOLD DATES 11/02/2023 THROUGH 11/02/2024
TEMPORARY REPAIR OF EXISTING ELECTRICAL BUSWAY SECTIONS THAT WERE DAMAGED DUE TO WATER LEAK. HUEN ELECTRIC WILL BE BACK AT A LATER DATE TO MAKE A PERMANENT REPAIR IN 8 - 10 WEEKS AFTER NEW BUSWAY SECTIONS ARE RECEIVED.
SELF-CERT 2019 CBC: INTERIOR ALTERATIONS TO AN EXISTING MERCANTILE SPACE ON THE GROUND FLOOR AS PER PLANS. WORK TO INCLUDE DEMOLITION, NEW PARTITIONS, CEILINGS, FINISHES, MECHANICAL, PLUMBING, AND ELECTRICAL. NOSTRUCTURAL WORK. (CONSTRUCTION TYPE: 1A; OCCUPANCY TYPE: M-MERCANTILE)
ERECT 1 SCAFFOLD FROM 3.15.2021 THRU 03.15.2022
PARKING GARAGE REPAIR: CAULKING & TRAFFIC BEARING MEMBRANE & EXPANSION JOINTS- (NO STRUCTURAL WORK)- ALL WORK SAME AS EXISTING; SUBJECT TO FIELD INSPECTIONS
WEST ELEVATION: 13'-4" X 1'-6" ILLUMINATED SIGN "LOADING DOCK"
WEST ELEVATION: 19'-11" X 1'-6" ILLUMINATED SIGN "EXIT ONLY"
WEST ELEVATION: 14'- 9" X 1'-6" ILLUMINATED SIGN "ENTRANCE"
No details available
INSTALL ONE ILLUMINATED WALL SIGN ON NORTH ELEVATION FACING NORTH
PROVIDE