No details available
No details available
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
No details available
MODERNIZATION OF ONE(1) 2500LB CAPACITY, 2-FLOOR, 125FPM, HYDRAULIC, PASSENGER ELEVATOR(#5), PURSUANT TO THE SCOPE OF WORK SUBMITTED.(#202344)
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
HOIST CABLE REPLACEMENT ON TWO(2) 3500LB CAPACITY, 30-FLOOR, 500FPM, PASSENGER ELEVATORS( #1 & 2), PURSUANT TO THE SCOPE OF WORK SUBMITTED.(#202344)
REPAIR DOOR, INT.
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN WINDOW
REPLACE HOISTWAY SILLS & DOORS, TOE GUARD, SUPPORTS, PIT LADDER, RE PIPE 110V CIRCUITS, CLEAN RUST FROM DOOR MOTORS, TRACKS, HEADERS, AND REPLACE TOP/BOTTOM ACCESS KEY SWITCH ON ONE(1) 2500LB CAPACITY, 2-FLOOR, 125FPM, PASSENGER HYDRAULIC ELEVATOR(#5), PURSUANT TO THE SCOPE OF WORK SUBMITTED.(A/P#202344)
REPLACE HOISTWAY SILLS & DOORS, TOE GUARDS, SUPPORTS, PIT LADDERS, RE PIPE 110V CIRCUITS, CLEAN RUST FROM DOOR MOTORS, TRACKS, HEADERS, AND REPLACE TOP/BOTTOM ACCESS KEY SWITCHES ON TWO(2) 2500LB CAPACITY, PASSENGER HYDRAULIC ELEVATORS(#4-#5), PURSUANT TO THE SCOPE OF WORK SUBMITTED.(A/P#202344)
ERECT TWO (2) SCAFFOLDS DATES 03/30/2022 THROUGH 03/30/2023
ERECT TWO (2)SCAFFOLD FROM 03/30/2022 - 03/30/2023
ERECT TWO (2)SCAFFOLD FROM 03/23/2021 TO 03/23/2022
REPLACE 2 - AIR COOLED CHILLERS LOCATED ON THE ROOF WITH 2 - CARRIER 308.7 TON, AIR COOLED, SELF CONTAINED, R134A CHILLERS.
ERECT 1 SCAFFOLD 10/7/2019 TO 10/7/2020
1HR SEP-D.U. AND REST OF BLDG
STOP SMOKE, NOXIOUS ODORS