1410 S MUSEUM CAMPUS DR, Chicago, IL · Chicago · 381 total events
LINE VOLTAGE ELECTRICAL WORK. NEW TEMPORARY 200 AMP SERVICE DISCONNECTING MEANS WITH 2 CIRCUITS. RECEPTACLE OUTLETS: 2 . LIGHTING OUTLETS: 2. SPECIFIC LOCATION: TEMPORARY GENERATOR ON THE STADIUM GREEN.
LINE VOLTAGE ELECTRICAL WORK. NEW TEMPORARY 200 AMP SERVICE DISCONNECTING MEANS WITH 2 CIRCUITS. RECEPTACLE OUTLETS: 2 . LIGHTING OUTLETS: 2. SPECIFIC LOCATION: TEMPORARY GENERATOR ON THE STADIUM GREEN.
PERMIT EXPIRES ON 05/17/2026 ERECTION STARTS: 3/30/2026, ERECTION ENDS: 3/31/2026. MEXTOUR 2026 FAN FEST AT&T TENT- 1 DAY EVENT MARCH 30, 2026 ERECT ONE (1) 27X27 (3.8MX3.8M) STRUCTURE TENTSETUP 3/30/2026- REMOVE 3/31/2026 ASSEMBLY
PERMIT EXPIRES ON 05/17/2026 ERECTION STARTS: 3/30/2026, ERECTION ENDS: 3/31/2026. MEXTOUR 2026 FAN FEST AT&T TENT- 1 DAY EVENT MARCH 30, 2026 ERECT ONE (1) 27X27 (3.8MX3.8M) STRUCTURE TENTSETUP 3/30/2026- REMOVE 3/31/2026 ASSEMBLY
PERMIT EXPIRES ON 04/24/2026 ERECTION STARTS: 3/30/2026, ERECTION ENDS: 3/31/2026. SELF CERT. CBC 2019. REINSTATEMENT OF 2024 PERMIT 101051244 FOR THE 2026 MEXICAN NATIONAL TEAM STAGE AT SOLDIER FIELD SOUTH GREEN ON MARCH 31 2026. SETUP ON MARCH 30 AND TAKEDOWN ON MARCH 31. SAME 1-24X20 SL100 WITH WINGS. CHICAGO SPECIAL EVENTS MANAGEMENT.
PERMIT EXPIRES ON 04/24/2026 ERECTION STARTS: 3/30/2026, ERECTION ENDS: 3/31/2026. SELF CERT. CBC 2019. REINSTATEMENT OF 2024 PERMIT 101051244 FOR THE 2026 MEXICAN NATIONAL TEAM STAGE AT SOLDIER FIELD SOUTH GREEN ON MARCH 31 2026. SETUP ON MARCH 30 AND TAKEDOWN ON MARCH 31. SAME 1-24X20 SL100 WITH WINGS. CHICAGO SPECIAL EVENTS MANAGEMENT.
LINE VOLTAGE ELECTRICAL WORK. NEW TEMPORARY 300 AMP SERVICE DISCONNECTING MEANS WITH 2 CIRCUITS. RECEPTACLE OUTLETS: 2 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: SOUTHEAST CORNER ON STADIUM GREEN.
LINE VOLTAGE ELECTRICAL WORK. NEW TEMPORARY 300 AMP SERVICE DISCONNECTING MEANS WITH 2 CIRCUITS. RECEPTACLE OUTLETS: 2 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: SOUTHEAST CORNER ON STADIUM GREEN.
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 1/13/2026. END DATE: 7/12/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 1/13/2026. END DATE: 7/12/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
THE WORK INVOLVES TENANT IMPROVEMENTS TO A CONCESSIONAIRE/FOOD SERVICE PROPERTY AT THE MUSEUM CAMPUS, OWNED BY THE PARKS DISTRICT. CONSTRUCTION OF NEW OUTDOOR BAR ON THE SITE'S EXISTING PATIO. BAR ENCLOSED BY ROOFED STRUCTURE AND USED SEASONALLY, THEREFORE NO CONDITIONED SPACES EXIST AND STRUCTURE IS EXEMPT FROM STATE ENERGY CODES. NEW ROOF BUILT INTO EXISTING STEEL TRELLIS. EXTENSIONS TO EXISTING PLUMBING AND ELECTRICAL SYSTEMS FEED NEW BAR EQUIPMENT CONSTRUCTION OF NEW PERMEABLE PAVER PATIO AM
PERMIT EXPIRES ON 12/24/2025 ERECTION STARTS: 10/31/2025, ERECTION ENDS: 11/2/2025. SELF CERT 2019 CDC. 1 24X20 SL100 MOBILE STAGE WITH 8X8 WINGS FOR THE IRELAND FAN TAILGATE PARTY AT SOLDIER FIELD STADIUM GREEN ON NOV 1 2025. SET-UP IS OCT 31 AND TAKEDOWN IS NOV 2, 2025. GAME DAY YOUR WAY WITH AYRE STAGING.
PERMIT EXPIRES ON 12/24/2025 ERECTION STARTS: 11/9/2025, ERECTION ENDS: 11/9/2025. CBC 2019. REINSTATEMENT OF 2024 PERMIT 101058268 FOR THE 2025 MOBILE STAGE FOR THE CHICAGO BEARS AT STADIUM GREEN ON NOV 9, 2025. SET-UP NOV 9 AND TAKEDOWN NOV 9, 2025. SAME 1 - 24X20 SL100 WITH WINGS. FROST CHICAGO LIGHTING CO. WITH SOUND WORKS PRODUCTION INC.
LINE VOLTAGE ELECTRICAL WORK. NEW TEMPORARY 200 AMP SERVICE DISCONNECTING MEANS WITH 2 CIRCUITS. RECEPTACLE OUTLETS: 2 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: SOUTH PARKING LOT.
PERMIT EXPIRES ON 12/17/2025 ERECTION STARTS: 10/31/2025, ERECTION ENDS: 11/3/2025. SELF CERT 2019 CDC. 2 - 40FT X 80FT ASSEMBLY POLE TENTS FOR THE IRELAND FAN TAILGATE PARTY AT SOLDIER FIELD STADIUM GREEN ON NOV 1 2025. SET-UP IS OCT 31 AND TAKEDOWN IS NOV 3 2025. GAME DAY YOUR WAY WITH JOLIET TENT CO.
PERMIT EXPIRES ON 12/14/2025 ERECTION STARTS: 10/25/2025, ERECTION ENDS: 10/25/2025. SELF CERT CBC2019. LIGHT THE NIGHT CHICAGO 2025 TENT AND STAGE ON OCT 25. SET-UP OCT 25 AND TAKEDOWN OCT 25, 2025. 1-40X40 TENT AND 1-SL100 MOBILE STAGE. BLOOD CANCER UNITED WITH LAKESHORE ATHLETIC SERVICES.
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 10/7/2025. END DATE: 1/5/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
PERMIT EXPIRES ON 12/03/2025 ERECTION STARTS: 10/17/2025, ERECTION ENDS: 10/18/2025. CBC2019 - REINSTATEMENT OD 2024 PERMIT 101059995 FOR THE 2025 ACS MAKING STRIDES STAGE ON OCT 18. SETUP IS OCT 17 AND TAKEDOWN IS OCT 18. SAME 1-24X20 SL100 STAGE WITH WINGS. CHICAGO RUNNING COMPANY WITH SESG.
PERMIT EXPIRES ON 12/02/2025 ERECTION STARTS: 10/19/2025, ERECTION ENDS: 10/19/2025. CBC 2019. REINSTATEMENT OF 2024 PERMIT 101058268 FOR THE 2025 MOBILE STAGE FOR THE CHICAGO BEARS AT STADIUM GREEN ON OCT 19, 2025. SET-UP OCT 19 AND TAKEDOWN OCT 19, 2025. SAME 1 - 24X20 SL100 WITH WINGS. FROST CHICAGO LIGHTING CO. WITH SOUND WORKS PRODUCTION INC.
PERMIT EXPIRES ON 11/10/2025 ERECTION STARTS: 9/26/2025, ERECTION ENDS: 9/27/2025. CBC2019 REINSTATEMENT OF 2022 PERMIT 100988694 FOR THE 2025 AIDS RUN STAGE AT STADIUM GREEN IN SOLDIER FIELD ON SEPT 27, 2025. SETUP ON SEPT. 26 AND TAKEDOWN ON SEPT 27. SAME 1-24X20 SL-100 MOBILE STAGE WITH WINGS. CHICAGO SPECIAL EVENTS MANAGEMENT.
PERMIT EXPIRES ON 11/05/2025 ERECTION STARTS: 9/21/2025, ERECTION ENDS: 9/21/2025. CBC 2019. REINSTATEMENT OF 2024 PERMIT 101058268 FOR THE 2025 MOBILE STAGE FOR THE CHICAGO BEARS AT STADIUM GREEN ON SEPT 21, 2025. SET-UP SEPT 21 AND TAKEDOWN SEPT 21, 2025. SAME 1 - 24X20 SL100 WITH WINGS. FROST CHICAGO LIGHTING CO. WITH SOUND WORKS PRODUCTION INC.
FOR PERMIT B200412302: REPLACEMENT ELECTRICAL CONTRACTOR. NEW CONTRACTOR(S) LISTED UNDER "OTHER APPLICANTS AND CONTRACTORS" ON PERMIT CERTIFICATE.
PERMIT EXPIRES ON 11/03/2025 ERECTION STARTS: 9/19/2025, ERECTION ENDS: 9/20/2025. SELF CERT. CBC2019 - REINSTATEMENT OF 2022 PERMIT 100987771 FOR THE 2025 ALS WALK AT SOLDIER FIELD STADIUM GREEN ON SEPT 20. SETUP IS SEPT19 AND TAKEDOWN IS SEPT 20, 2025. SAME 1- SL250 32X24 MOBILE STAGE. LAKESHORE ATHLETIC SERVICES.
SPR 2019 CBRC EXTERIOR ONLY EXPANSION OF EXISTING LEVEL 400 WEST CONCOURSE DECK INCLUDING NEW STAIR, RAILINGS TO MATCH EXISTING AND LIGHTING FIXTURES UNDER NEW DECK, NO PLUMBING OR HVAC. NO ADDITIONAL STADIUM OCCUPANCY. DECK EXPANSION FOR OCCUPANT CIRCULATION ONLY. (OCC A5 FS CON IIB)
PERMIT EXPIRES ON 10/22/2025 ***SELF-CERT***ERECTION STARTS:08/24/25, ERECTION ENDS:09/02/25 ERECTION OF TEMPORARY STAGE FOR A THE LUMINEERS CONCERT AT SOLDIER FIELD, EVENT DATE AUGUST 30TH, 2025 OVERALL AREA: 19,712 SQ.FT., INCLUDING:1.) MAIN STAGE: 176'X80' = 14,080 SF2.) ARROW SHAPED THRUST STAGE: 1,372 SF3.) MIX HUT: 24' X 24'= 576 SF X 2= 1,152 SF5.) 72' TALL DELAY TOWERS: 37'X21' = 777 SF X 4 = 3,108 SF
PERMIT EXPIRES ON 10/22/2025 ***SELF-CERT***ERECTION STARTS:08/24/25, ERECTION ENDS:09/02/25 ERECTION OF TEMPORARY STAGE FOR AN OASIS CONCERT AT SOLDIER FIELD, EVENT DATE AUGUST 28TH, 2025 OVERALL AREA: 18,340 SQ.FT., INCLUDING:1.) MAIN STAGE: 176'X80' = 14,080 SF2.) MIX HUT: 24' X 24'= 576 SF X 2= 1,152 SF5.) 72' TALL DELAY TOWERS: 37' X21' = 777 SF X 4 = 3,108 SF
PERMIT EXPIRES ON 10/21/2025 ***SELF-CERT***ERECTION STARTS:08/24/25, ERECTION ENDS:09/02/25 ERECTION OF TEMPORARY STAGE FOR A MY CHEMICAL ROMANCE CONCERT AT SOLDIER FIELD, EVENT DATE AUGUST 29TH, 2025 OVERALL AREA: 19,190 SQ.FT., INCLUDING:1.) MAIN STAGE: 176'X80' = 14,080 SF2.) B-STAGE: 850 SF3.) MIX HUT: 24' X 24'= 576 X 2 = 1,152 SF5.) 72' TALL DELAY TOWERS: 37'X21' = 777 SF X 4 = 3,108 SF
PERMIT EXPIRES ON 10/19/2025 ERECTION STARTS: 8/24/2025, ERECTION ENDS: 9/2/2025. ERECTION STARTS: , ERECTION ENDS: . ***SELF-CERT***ERECTION STARTS:08/24/25, ERECTION ENDS:09/02/25 ERECTION OF TEMPORARY STAGE FOR A SYSTEM OF A DOWN CONCERT AT SOLDIER FIELD, EVENT DATE SEPTEMBER 1ST, 2025 OVERALL AREA: 18,340 SQ.FT., INCLUDING:1.) MAIN STAGE: 176'X80' = 14,080 SF2.) MIX HUT: 24' X 24'= 576 SF X 2 = 1,152 SF5.) 72' TALL DELAY TOWERS: 37'X21' = 777 SF X 4 = 3,108 SF
PERMIT EXPIRES ON 10/19/2025 ERECTION STARTS: 9/18/2025, ERECTION ENDS: 9/20/2025. CBC 2019. AHA HEART WALK 2025 MOBILE STAGE AT SOLDIER FIELD SOUTH LOT ON SEPT 19, 2025. SETUP SEPT 18 AND TAKEDOWN SEPT 20, 2025. 1-24X20 SL100 MOBILE STAGE. RAVENSWOOD EVENTS WITH SOUNDWORKS PRO.
LINE VOLTAGE ELECTRICAL WORK. NEW TEMPORARY 200 AMP SERVICE DISCONNECTING MEANS WITH 2 CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 1. SPECIFIC LOCATION: SOUTH PARKING LOT.
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 8/29/2025. END DATE: 9/28/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 8/30/2025. END DATE: 9/29/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 9/1/2025. END DATE: 10/1/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 8/28/2025. END DATE: 9/27/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
PERMIT EXPIRES ON 10/05/2025 ERECTION STARTS: 8/8/2025, ERECTION ENDS: 8/9/2025. SELF CERT. CBC2019. REINST OF 2023 PERMIT 101011115 FOR THE 2025 NIGHT NATION RUN MOBILE STAGE AT SOLDIER FIELD SOUTH LOT ON AUG 9, 2025. SET-UP AUG 8 AND TAKEDOWN AUG 9, 2025. SAME 1-32X24 APEX MOBILE STAGE. TMT PRODUCTIONS LLC WITH CHICAGO SPECIAL EVENTS MANAGEMENT.
PERMIT EXPIRES ON 09/25/2025 ERECTION STARTS: 8/8/2025, ERECTION ENDS: 8/8/2025. CBC 2019. REINSTATEMENT OF PERMIT 101058268 FOR THE 2025 MOBILE STAGE FOR THE CHICAGO BEARS AT STADIUM GREEN ON AUG 8, 2025. SAME 1 - 24X20 SL100 WITH WINGS. FROST CHICAGO LIGHTING CO. WITH SOUND WORKS PRODUCTION INC.
PERMIT EXPIRES ON 09/08/2025 ERECTION STARTS: 7/22/2025, ERECTION ENDS: 7/22/2025. SELF CERT CBC2019. PETERBILT MEDIUM DUTY C2C RIDE AND DRIVE 2025 TENT AT SOLDIER FIELD SOUTH LOT. 1-30X80 FRAME TENT. LAKESHORE ATHLETIC SERVICES, INC.
PERMIT EXPIRES ON 09/18/2025 ***SELF-CERT***ERECTION STARTS:07/15/25, ERECTION ENDS:07/19/25 ERECTION OF TEMPORARY STAGE FOR BLACKPINK CONCERT AT SOLDIER FIELD, EVENT DATES JULY 18TH, 2025 OVERALL AREA: 23,865 SQ.FT., INCLUDING1.) MAIN STAGE: 160'X72' = 11,520 SF2.) OVAL SHAPED B-STAGE: 2,605 SF3.) CURVED RUNWAY STAGES: 2,308 SF X 2 =4,616 SF4.) MIX HUT: 24' X 32'= 768 SF5.) 60' TALL DELAY TOWERS: 33' X 33' = 1,089 SF X 4 = 4,.356 SF
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 7/8/2025. END DATE: 10/6/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 7/18/2025. END DATE: 8/17/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
PERMIT EXPIRES ON 08/17/2025 ERECTION STARTS: 6/19/2025, ERECTION ENDS: 6/22/2025. SELF CERT CBC 2019. MOBILE STAGES FOR MELTIN MARGS MUSIC FESTIVAL AT SOLDIER FIELD SOUTH PARKING LOT. 1-32X24 SL-250 MOBILE STAGE WITH 2-8X8 WINGS AND 1-24X20 SL100 MOBILE STAGE. CHICAGO SPECIAL EVENTS MANAGEMENT.
PERMIT EXPIRES ON 08/16/2025 ERECTION STARTS: 6/27/2025, ERECTION ENDS: 6/28/2025. CBC2019 - MOBILE STAGE FOR THE 2025 CHICAGO HOUSE RUN AT SOLDIER FIELD SOUTH LOT. 1-20X24 SL100 MOBILE STAGE WITH WINGS. FERNANDO NIETO WITH HRP CHICAGO LLC.
PERMIT EXPIRES ON 08/06/2025 ERECTION STARTS: 7/11/2025, ERECTION ENDS: 7/12/2025. BIG TEN 10K 2025MOBILE STAGE- REINSTATE 101022725 1 DAY EVENT 07/12/2025 ERECT ONE (1) 24X16 MOBILE STAGE. ERECT 7/11/2025 - REMOVE 7/12/2025ASSEMBLY
PERMIT EXPIRES ON 08/06/2025 ERECTION STARTS: 6/19/2025, ERECTION ENDS: 6/22/2025. CBC 2019. SELF CERTIFICATION. TENT FOR THE MELTIN MARGS MUSIC FESTIVAL AT SOLDIER FIELD SOUTH PARKING LOT. 1-20X100 TENT. ULTIMATE RENTAL SERVICES.
PERMIT EXPIRES ON 08/05/2025 ERECTION STARTS: , ERECTION ENDS: . ***SELF-CERT***ERECTION STARTS:06/02/25, ERECTION ENDS:06/07/25 ERECTION OF TEMPORARY STAGE FOR A THE WEEKND CONCERT AT SOLDIER FIELD, EVENT DATES JUNE 6TH, 2025 OVERALL AREA: 19,975 SQ.FT., INCLUDING1.) MAIN STAGE: 168'X56' = 9,408 SF2.) STAGE APRON: 32'X95' = 3,040 SF3.) RUNWAY STAGES: 50'X8' = 400 SF X 4 =1,600 SF4.) TRIANGLE STAGE: 525 SF5.) 32' DIAMETER CIRCLR STAGE: 804 SF6.) SQUARE STAGE: 28'X28' = 784 SF7.) 63' TALL DELAY
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 6/2/2025. END DATE: 7/2/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
PERMIT EXPIRES ON 07/28/2025 ***SELF-CERT***ERECTION STARTS:05/26/25, ERECTION ENDS:06/01/25 ERECTION OF TEMPORARY STAGE FOR A THE WEEKND CONCERT AT SOLDIER FIELD, EVENT DATES MAY 30TH & 31ST, 2025 OVERALL AREA: 22,097 SQ.FT., INCLUDING1.) MAIN STAGE: 184X65= 11,960 SF2.) STAGE APRON: 40X71 = 2,840 SF3.) RUNWAY THURST 1: 95X8 = 760 SF4.) RUNWAY THRUST 2: 90X8 = 720 SF5.) THRUST STAGE 1: 66X8 = 528 SF6.) THRUST STAGE 1: 66X8 = 528 SF7.) `B STAGE: 40X40 = 1,600 SF8.) `C STAGE: 35X35 = 1,225 SF9.
PERMIT EXPIRES ON 07/21/2025 ***SELF-CERT***ERECTION STARTS:05/21/25, ERECTION ENDS:05/25/25 ERECTION OF TEMPORARY STAGE FOR AN ACDC CONCERT AT SOLDIER FIELD, EVENT DATES MAY 24TH , 2025 OVERALL AREA: 15,718 SQ.FT., INCLUDING1.) MAIN STAGE: 72X180= 12,960 SF2.) FRONT OF HOUSE (F.O.H.) HUT: 20X37= 740 SF3.) THRUST STAGE: 29X10= 290 SF4.) B STAGE:24X24= 576 SF5.) 66 TALL DELAY TOWERS: 24X24= 576 SF X 2 = 1,152 SF
PERMIT EXPIRES ON 07/13/2025 ERECTION STARTS: 5/12/2025, ERECTION ENDS: 5/20/2025. ***SELF-CERT***ERECTION STARTS:05/12/25, ERECTION ENDS:05/20/25 ERECTION OF TEMPORARY STAGE FOR A BEYONCE CONCERT AT SOLDIER FIELD, EVENT DATES MAY 15TH ,17TH & 18TH, 2025 OVERALL AREA: 28,615 SQ.FT., INCLUDING1.) MAIN STAGE: 14,529 SF2.) STAR SHAPED STAGE: 6,782 SF3.) RUNWAY THRUST STAGE: 1,260 SF4.) STAGE LEFT (SL) RUNWAY: 1,187 SF5.) STAGE RIGHT (RL) RUNWAY: 1,187 SF6.) MIX HUT: 400 SF X 2 = 800 SF7.) B STAGE:
PERMIT EXPIRES ON 07/12/2025 ERECTION STARTS: 5/23/2025, ERECTION ENDS: 5/24/2025. SELF CERT CBC2019 - REINSTATEMENT OF 2024 PERMIT 101050566 FOR THE 2025 SOLDIER FIELD 10 MILE EVENT ON MAY 24. SAME 1-24X20 SL100 WITH WINGS. VENTURES ENDURANCE WITH SESG.