ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 4/1/2026. END DATE: 9/28/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 4/1/2026. END DATE: 9/28/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
No details available
PERMIT EXPIRES ON 09/02/2025 ERECTION STARTS: 06/26/2025 ERECTION ENDS: 06/28/2025 ***SELF-CERT*** ERECTION OF TWO (2) TEMPORARY 30' TALL DELAY TOWERS FOR A DAVE MATTHEWS BAND CONCERT AT NORTHERLY ISLAND ON JUNE 27 & 28TH, 2025.OVERALL AREA: 480 SQ.FT., INCLUDING:1.) TWO (2) 30' TALL DELAY TOWERS EACH AT 12' X 20' = 240 SQFT X 2 = 480 SQ.FT.
No details available
LINE VOLTAGE ELECTRICAL WORK. NEW TEMPORARY 100 AMP SERVICE DISCONNECTING MEANS WITH 1 CIRCUITS. NEW TEMPORARY 100 AMP SERVICE DISCONNECTING MEANS WITH 1 CIRCUITS. NEW TEMPORARY 100 AMP SERVICE DISCONNECTING MEANS WITH 1 CIRCUITS. NEW TEMPORARY 100 AMP SERVICE DISCONNECTING MEANS WITH 1 CIRCUITS. NEW TEMPORARY 100 AMP SERVICE DISCONNECTING MEANS WITH 1 CIRCUITS. NEW TEMPORARY 100 AMP SERVICE DISCONNECTING MEANS WITH 1 CIRCUITS. RECEPTACLE OUTLETS: 2 . LIGHTING OUTLETS: 2. SPECIFIC LOCATION: SOUT
PERMIT EXPIRES ON 08/26/2025 ERECTION STARTS: 5/29/2025, ERECTION ENDS: 6/11/2025. ***SELF-CERT***ERECTION STARTS:05/29/25, ERECTION ENDS:06/011/25 ERECTION OF THREE (3) TENT CANOPY STRUCTURES & TWENTY THREE (23) LIGHT TOWER TRUSSES FOR A BEYOND WONDERLAND FESTIVAL CONCERT AT NORTHERLY ISLAND, EVENT DATES JUNE 6TH-8TH 2025 OVERALL AREA: 40,916 SQ.FT., INCLUDING1.) TENT P5: 50X82 = 4,100 SF2.) TENT P1: 100 X 148 =14,800 SF3.) TENT P10: 164 X132 = 21,648 SF4.) LIGHT TOWER TRUSSES: 4 X4=16SF X 23=
PERMIT EXPIRES ON 08/06/2025 ***SELF-CERT***ERECTION STARTS:05/29/25, ERECTION ENDS:06/011/25 ERECTION OF THREE (3) TEMPORARY STAGES AND MULTIPLE STRUCTURAL ELEMENTS FOR A BEYOND WONDERLAND FESTIVAL CONCERT AT NORTHERLY ISLAND, EVENT DATES JUNE 6TH-8TH 2025 OVERALL AREA: 51,459 SQ.FT., INCLUDINGSTAGES (45,434 SF)1.) STAGE 2: 154X56 =8,624 SF2.) STAGE 3: 134X165 =22,110 SF3.)STAGE 4: 100X147=14,700 SFART INSTALLATION (354 SF)1.) WHITE RABBIT: 15X10 =150 SF2.) CATERPILLAR: 17X12 =205 SFELEVATED E
LINE VOLTAGE ELECTRICAL WORK. NEW TEMPORARY 200 AMP SERVICE DISCONNECTING MEANS WITH 1 CIRCUITS. NEW TEMPORARY 250 AMP SERVICE DISCONNECTING MEANS WITH 1 CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 1. SPECIFIC LOCATION: SOUTH LAWN.
LINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 100 AMP SERVICE DISCONNECTING MEANS WITH 1 CIRCUITS. NEW PERMANENT 100 AMP SERVICE DISCONNECTING MEANS WITH 1 CIRCUITS. NEW PERMANENT 100 AMP SERVICE DISCONNECTING MEANS WITH 1 CIRCUITS. NEW PERMANENT 100 AMP SERVICE DISCONNECTING MEANS WITH 1 CIRCUITS. NEW PERMANENT 100 AMP SERVICE DISCONNECTING MEANS WITH 1 CIRCUITS. NEW PERMANENT 100 AMP SERVICE DISCONNECTING MEANS WITH 1 CIRCUITS. NEW PERMANENT 100 AMP SERVICE DISCONNECTING MEANS WITH 1 CIRCUITS. N
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 4/14/2025. END DATE: 10/11/2025. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
PERMIT EXPIRES ON 05/28/2025 ERECTION STARTS: 4/14/2025, ERECTION ENDS: 10/11/2025. CBC 2019-PEER REVIEW. 2025 LIVE NATION SEASONAL BLEACHERS AND GRANDSTANDS. 1- 60FT X 184FT DOUBLE- DECKER GRANDSTAND AND 1- 68FT X 125FT BLEACHER FOR THE 2025 CONCERT SEASON (SAME SIZE AS THE 2019-2024 PERMITS) ON MAY 29, 2025 THRU OCT 11, 2025. LIVE NATION ENTERTAINMENT WITH INPRODUCTION INC.
PERMIT EXPIRES ON 05/21/2025 ERECTION STARTS: 4/14/2025, ERECTION ENDS: 10/11/2025. CBC 2019 SELF CERT - 2025 LIVE NATION SUMMER CONCERT SMALL MERCH AND ENTRY TENTS AT NORTHERLY ISLAND. 2-10X50S, 1-12.5X70, 2-20X30S, 3-20X40S, 1-20X60 AND 1-30X60 SMALL TENTS. PARTYTIME-HDO OPERATIONS.
PERMIT EXPIRES ON 05/20/2025 ERECTION STARTS: 5/5/2025, ERECTION ENDS: 10/17/2025. CBC 2019 WITH PEER REVIEW. REINSTATEMENT OF 2024 PERMIT 101047179 FOR THE SAME 1-43'X120' SEASONAL OPEN TENT BUILT ON TOP OF EXISTING VIP GRANDSTAND AT LIVE NATION AT NORTHERLY ISLAND (SAME TENT AS THE LAST 10 YEARS). EVENTS ARE PLANNED TO BE HELD FROM MAY 29 - OCT 11, 2025. LIVE NATION WITH PARTYTIME-HDO OPERATIONS LLC.
INSTALLATION OF ONE(1) TEMPORARY 750LB CAPACITY, 12FT RISE, 14FPM, VERTICAL PLATFORM LIFT, PURSUANT TO THE SCOPE OF WORK PLANS SUBMITTED.
No details available
PERMIT EXPIRES ON 12/09/2024 ERECTION STARTS: 10/07/2024 ERECTION ENDS: 10/12/2024 ***SELF-CERT*** ERECTION OF FOUR (4) TEMPORARY 33' TALLSCAFFOLD TOWERS FOR A JOHN SUMMIT CONCERT AT NORTHERLY ISLAND ON OCTOBER 10TH-12TH, 2024.OVERALL AREA: 256 SQ.FT., INCLUDING:1.) FOUR (4) 30' TALL DELAY TOWERS EACH AT 8 X 8' = 64 SQFT X 4 = 256 SQ.FT.
LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 0 . LIGHTING OUTLETS: 1. SPECIFIC LOCATION: GROUND FLOOR.
PERMIT EXPIRES ON 09/18/2024 ERECTION STARTS: 07/25/2024 ERECTION ENDS: 07/28/2024 ***SELF-CERT*** ERECTION OF TWO (2) TEMPORARY 30' TALL DELAY TOWERS FOR A VAMPIRE WEEKEND CONCERT AT NORTHERLY ISLAND ON JULY 26TH & 27TH, 2024.OVERALL AREA: 480 SQ.FT., INCLUDING:1.) TWO (2) 30' TALL DELAY TOWERS EACH AT 12' X 20' = 240 SQFT X 2 = 480 SQ.FT.
GROUNDING AND FINAL CONNECTIONS FOR 7 TEMPORARY GENERATORS 1 20 KW 2 56 KW 3 100 KW AND 175 KW GENERATORS FOR VAMPIRE WEEKEND EXPANDED LAWN SHOW ON 7/26 AND 7/27
GROUNDING AND FINAL CONNECTIONS FOR 1 AMUSEMENT RIDE FOR THE EXPANDED LAWN SHOW VAMPIRE WEEKEND ON JULY 26TH AND JULY 27TH
PERMIT EXPIRES ON 07/31/2024 ERECTION STARTS: 5/28/2024, ERECTION ENDS: 6/4/2024. BEYOND WONDERLAND GHOST SLIDE STRUCTURESTRUCTURE- PEER REVIEW- SELF-CERT, 2 DAY EVENT JUNE 1-2, 2024ERECT ONE (1) 35X35 STRUCTURE WITH 40X40 LAY DOWN FLOORINGSETUP 5/30/24- REMOVE 6/3/24, ASSEMBLY
PERMIT EXPIRES ON 07/28/2024 ERECTION STARTS: 5/27/2024, ERECTION ENDS: 6/5/2024. BEYOND WONDERLAND STAGE STRUCTURESSTAGE- SELF-CERT, 2 DAY EVENT JUNE 1-2, 2024 ERECT FIVE (5) STRUCTURES- ONE (1) 72X20X2,3,4 PLATFORM, TWO (2) 17.5'- 12" BOX TRUSS FLOWER, TWO (2) 17'- 12" BOX TRUSS FLOWER, SETUP 5/27/24- REMOVE 6/5/24, ASSEMBLY
PERMIT EXPIRES ON 07/28/2024 ERECTION STARTS: 5/27/2024, ERECTION ENDS: 6/5/2024. BEYOND WONDERLAND MOBILE STAGESMOBILE STAGES- SELF-CERT, 2 DAY EVENT JUNE 1-2, 2024ERECT EIGHT (8) STRUCTURES- ONE (1) 50X42X43 SAM 575 MOBILE STAGE, TWO (2) 48X32X41SCAFFOLD STRUCTURES, TWO (2) 8X16X6 PLATFORMS, ONE (1) 44X38X41 SAM 450 MOBILE STAGE WITH 16X32 STAGE RIGHT AND STAGE LEFT WINGS, AND TWO (2) 8X8X5 PLATFORMS, SETUP 5/27/24- REMOVE 6/5/24, ASSEMBLY
PERMIT EXPIRES ON 07/28/2024 ERECTION STARTS: 5/27/2024, ERECTION ENDS: 6/5/2024. BEYOND WONDERLAND SITE STRUCTURESMOBILE STAGES- SELF-CERT, 2 DAY EVENT JUNE 1-2, 2024ERECT SEVENTY-FIVE (75) STRUCTURES- TWO (2) 80X8X17 STAKED CARGO CONTAINER, FIVE (5) 40X8X17 STACKED CARGO CONTAINER, SIX (6) 12' DIA X 17' NFLATABLE MUSHROOMS, ONE (1) 12X3X17 VIP PORTAL 2, TWO (2) 15X3X17 VIP PORTAL 3, ONE (1) 17X37X18 VIP PORTAL 4, TWENTY-THREE (23) 4X4X20 20.5 BOX TRUSS LIGHT TOWER, ONE (1) 8DIAX16 QUEEN CHESS
INSTALLATION OF THREE (3) 750LB.CAP, 10 FPM, 12 FOOT RISE, VERTICAL PLATFORM LIFT AT CORONA, BACARDI, & PLANTIUM LOUNGE AREAS OF NORTHERLY ISLAND FOR SUENOS CHICAGO EVENT. PURSUANT TO THE SCOPE OF WORK AND LAY-OUT PLANS.
PERMIT EXPIRES ON 07/16/2024 ERECTION STARTS: 5/27/2024, ERECTION ENDS: 6/5/2024. BEYOND WONDERLAND SMALL TENTSTENTS- SELF-CERT, 2 DAY EVENT JUNE 1-2, 2024ERECT TWENTY (20) STRUCTURES- ONE (1) 10X50 FRAME, THREE (3) 10X60 FRAME, TWO (2) 10X70 FRAME, TWO (2) 10X80 FRAME, ONE (1) 10X90 FRAME, ONE (1) 10X120 FRAME, ONE (1) 10X130 FRAME, THREE (3) 20X60 FRAME, ONE (1) 20X60 (6MX18M) STRUCTURE, ONE (1) 20X80 (6MX24M) STRUCTURE, ONE (1) 20X120, TWO (2) 30X30 (9MX9M) STRUCTURE, ONE (1) 40X40 (12MX12M)
PERMIT EXPIRES ON 07/14/2024 ERECTION STARTS: 5/27/2024, ERECTION ENDS: 6/3/2024. BEYOND WONDERLAND SMIRNOFF ICE BOX TRUSS STRUCTURE STRUCTURE- SELF-CERT, 2 DAY EVENT JUNE 1-2, 2024 ERECT ONE (1) 25X25X11 12" BOX TRUSS STRUCTURESETUP 5/27/24- REMOVE 6/3/24, ASSEMBLY
PERMIT EXPIRES ON 07/14/2024 ERECTION STARTS: 5/27/2024, ERECTION ENDS: 6/5/2024. BEYOND WONDERLAND LARGE TENTSTENTS- PEER REVIEW- SELF-CERT, 2 DAY EVENT JUNE 1-2, 2024ERECT TWO (2) STRUCTURES- ONE (1) 50X82 (15MX25M) STRUCTURE, ONE (1) 100X148 (30MX45M) STRUCTURESETUP 5/27/24- REMOVE 6/5/24, ASSEMBLY
PERMIT EXPIRES ON 07/14/2024 ERECTION STARTS: 5/30/2024, ERECTION ENDS: 6/3/2024. BEYOND WONDERLAND ELECTROLIT BOX TRUSS STRUCTURESTRUCTURE- SELF-CERT, 2 DAY EVENT JUNE 1-2, 2024ERECT ONE (1) 20X30X16 12" BOX TRUSS STRUCTURESETUP 5/30/24- REMOVE 6/3/24, ASSEMBLY
GROUNDING AND FINAL ELECTRICAL CONNECTIONS FOR GONDOLA WHEEL AND VERTIGO SWING CARNIVAL RIDES FOR THE BEYOND WONDERLAND EVENT ON JUNE 1ST AND JUNE 2ND. ELECTRICAL CONNECTIONS TO MAIN DISCONNECT ONLY.
EXPANDED LAWN SET UP FOR THE BEYOND WONDERLAND EVENT ON JUNE 1ST AND JUNE 2ND GROUNDING AND FINAL CONNECTIONS OF TEMPORARY GENERATORS STAGES AND OFFICE TRAILERS CORD MANAGEMENT INSTALL CABLE RAMPS AS NEEDED
PERMIT EXPIRES ON 06/18/2024 ERECTION STARTS: 05/06/2024, ERECTION ENDS: 10/14/2024. CBC 2019 WITH PEER REVIEW. 1-43'X120' OPEN TENT BUILT ON TOP OF EXISTING VIP GRANDSTAND AT LIVE NATION AT NORTHERLY ISLAND (SAME TENT AS THE LAST 10 YEARS). PARTYTIME-HDO OPERATIONS LLC.
INSTALLATION OF ONE(1) TEMPORARY 750LB CAPACITY, 14FPM, 12FT RISE, VERTICAL PLATFORM LIFT, PURSUANT TO THE SCOPE OF WORK PLANS SUBMITTED.
MONTHLY MAINTENANCE FOR JUNE 2024 EM AND EGRESS LIGHTING MAINTAIN GROUNDING OF GENERATORS, STAGES , STAIRS AND EQUIPMENT. TEST GFCIS CORD MANAGEMENT
MONTHLY MAINTENANCE FOR OCTOBER 2024 EM AND EGRESS LIGHTING MAINTAIN GROUNDING OF GENERATORS, STAGES , STAIRS AND EQUIPMENT. TEST GFCIS CORD MANAGEMENT
MONTHLY MAINTENANCE FOR AUGUST 2024 EM AND EGRESS LIGHTING MAINTAIN GROUNDING OF GENERATORS, STAGES , STAIRS AND EQUIPMENT. TEST GFCIS CORD MANAGEMENT
MONTHLY MAINTENANCE FOR SEPTEMBER 2024 EM AND EGRESS LIGHTING MAINTAIN GROUNDING OF GENERATORS, STAGES , STAIRS AND EQUIPMENT. TEST GFCIS CORD MANAGEMENT
MONTHLY MAINTENANCE FOR JULY 2024 EM AND EGRESS LIGHTING MAINTAIN GROUNDING OF GENERATORS, STAGES , STAIRS AND EQUIPMENT. TEST GFCIS CORD MANAGEMENT
MONTHLY MAINTENANCE FOR MAY 2024 EM AND EGRESS LIGHTING MAINTAIN GROUNDING OF GENERATORS, STAGES , STAIRS AND EQUIPMENT. TEST GFCIS CORD MANAGEMENT
PERMIT EXPIRES ON 06/02/2024 ERECTION STARTS: 4/12/2024, ERECTION ENDS: 10/9/2024. CBC 2019 SELF CERT - LIVE NATION SUMMER CONCERT SMALL MERCH AND ENTRY TENTS AT NORTHERLY ISLAND. 2-10X50S, 1-12.5X70, 2-20X30S, 2-20X40S, AND 1-30X60 SMALL TENTS. PARTYTIME-HDO OPERATIONS.
PERMIT EXPIRES ON 05/06/2024 ERECTION STARTS: 3/28/2024, ERECTION ENDS: 10/12/2024. CBC 2019. REINSTATEMENT OF 2019 PERMIT 100820941 FOR THE 2024 LIVE NATION SEASONAL BLEACHERS AND GRANDSTANDS. SAME 1-DOUBLE- DECKER GRANDSTAND 60X184 AND 1-BLEACHER 68X126 FOR SEASONAL CONCERTS - MAY 23, 2024 THRU OCT 12, 2024. LIVE NATION ENTERTAINMENT.
No details available
No details available
PERMIT EXPIRES ON 08/23/2023 ERECTION STARTS: 7/6/2023, ERECTION ENDS: 7/8/2023. ERECTION STARTS: 7/6/2023, ERECTION ENDS: 7/8/2023. ERECTION STARTS: , ERECTION ENDS: . ***SELF-CERT*** ERECTION OF TWO (2) TEMPORARY 30' TALL DELAY TOWERS FOR A DAVE MATTHEWS BAND CONCERT AT NORTHERLY ISLAND.OVERALL AREA: 880 SQ.FT., INCLUDING:1.) TWO (2) 30' TALL DELAY TOWERS EACH AT 22' X 20' = 440 SQFT X 2 = 880 SQ.FT.ERECTION STARTS: 07/06/2023 ERECTION ENDS: 07/08/2023
PERMIT EXPIRES ON 08/06/2023 ERECTION STARTS: 6/9/2023, ERECTION ENDS: 6/13/2023. INFLATABLE - SELF-CERT, 2 DAY EVENT (6/10,11/2023) AURIS PRESENTS- HEATWAVE INFLATABLEERECT ONE (1) INFLATABLE DUCK 64X74X61ERECT 6/9/2023- REMOVE 6/13/2023ASSEMBLY
GROUNDING AND FINAL HOOK-UPS FOR 10 GENERATORS FOR HEAT WAVE FESTIVAL SAT. JUN 10TH AND SUNDAY JUNE 11TH CABLING AND STAGE GROUNDING. 4 320KW 1 175KW 4 100KW AND 1 55KW GENERATORS. SET UP IN THE LAWN AT HUNTINGTON BANK PAVILION.
PERMIT EXPIRES ON 07/26/2023 ERECTION STARTS: 6/6/2023, ERECTION ENDS: 6/13/2023. STRUCTURES - SELF-CERT, 2 DAY EVENT (6/10,11/2023) AURIS PRESENTS- HEATWAVE ERECT ELEVEN (15) STRUCTURES- MOBILE STAGE 1- APEX5040, 50X40X5 MOBILE STAGE WITH 24X40 STAGE RIGHT, 24X40 STAGE LEFT, AND 106X16 UPSTAGE RIGHT CROSS OVER, 2 SCAFFOLD LIGHT/VIDEO STRUCTURES- 24X24X34.5, ONE STAGE RIGHT, ONE STAGE LEFT; MOBILE STAGE 2- APEX5040, 50X40X5 MOBILE STAGE WITH 8X40 STAGE RIGHT, 8X40 STAGE LEFT, AND 106X16 UPSTAG
PERMIT EXPIRES ON 07/25/2023 ERECTION STARTS: 6/7/2023, ERECTION ENDS: 6/13/2023. TENTS - SELF-CERT, 2 DAY EVENT (6/10,11/2023) AURIS PRESENTS- HEATWAVE TENTS ERECT ELEVEN (2) 40X40 FRAME TENTS ERECT 6/7/2023- REMOVE 6/13/2023ASSEMBLY
MONTHLY MAIN FOR AUGUST 2023 MAINTAIN EM AND EGRESS LIGHTING GROUNDING OF GENERATORS STAGES TRAILERS AND EQUIPMENT CORD MANAGEMENT TEST GFCIS