ADA BATHROOM MODIFICATIONS. REMOVE TUB AND INSTALL SHOWER WITH ASSOCIATED FIXTURES AND TILE WORK.
MAINT PLATFORM LIFT
RUN ELECTRIC TO POWER LIFT.
CONSTRUCT A WOODEN DECK, STAIRS AND HANDRAILS IN FRONT
INSTALLATION OF (1) ONE RESIDENTIAL VERTICAL PLATFORM LIFT AT THE FRONT OF THE HOME, 750LBS CAPACITY @ 10FPM, PURSUANT TO PLANS SUBMITTED AND SUBJECT TO CITY OF CHICAGO DEPT. OF BUILDINGS ELEVATOR BUREAU INSPECTION.