INSTALL NEW 200 AMP SERVICE: METER SOCKET, RISER AND PANEL. INSTALL NEW PIPE AND WIRE AND OUTLETS AND SWITCHES AND FIXTURES THROUGHOUT PREMISE. INSTALL COLD WATER AND AUXILIARY GROUND. INSTALL ARC FAULT BREAKERS FOR BEDROOMS. INSTALL NEW COURTESY OUTLETS ON FRONT AND REAR OUTSIDE WALLS.
WINDOWS (REPLACEMENT ONLY): QTY 12, DOORS (REPLACEMENT ONLY): QTY 2, HOT WATER HEATER (REPLACEMENT ONLY): QTY 1 CHANGE WATER PIPE TO COPPER,REPLACE DRAINS & WASTE CONNECTION.REPLACE ALL D.W.V AND WATER PIPING FOR 2 UNIT BUILDING
ARRANGE PREMISE INSPECTION