UPGRADE METER SOCKET AND INSTALL PROPER GROUNDING
UPGRADE METER SOCKET AND INSTALL PROPER GROUNDING
WINDOWS (REPLACEMENT ONLY): QTY 9, ROOF RECOVER ONLY - NO STRUCTURAL WORK, FURNACE (REPLACEMENT ONLY): QTY 1
WINDOWS (REPLACEMENT ONLY): QTY 9, ROOF RECOVER ONLY - NO STRUCTURAL WORK, FURNACE (REPLACEMENT ONLY): QTY 1
REMOVE & REPLACE DRYWALL IN BASEMENT (4' ABOVE FLOOR), FURNACE INSULLATION , AND REPLACE WATER HEATER. SAME SIZE AND LOCATIONS.
POST OWNER NAME OF VACNT BLDG
WATCHMAN
OBTAIN OR POST PERMIT
VACANT BUILDING - REGISTER
POST OWNER INFO ON ABDN BLDG
REPAIR/WRECK DANGER RESID PREM
MAINTAN BLDG IN SAFE CONDITION