No details available
ARRANGE PREMISE INSPECTION
PROV HOT WTR TO ALL FIXTURES
ENGAG LIC & BOND PLMBNG CNTRC
PROPER MATERIAL FOR HSE DRAIN
REPLACE DEFECTIVE PLBG FIXTURE
PRV CLEANOUT AT BASE OF STACK
PROVIDE AIR CHAMERS
LICENSED BONDED PLMBG CONTRCTR
REMOVE STAGNANT WATER BSMT
REMV OBSTR FROM DRAINAGE SYSTM
OBTN PERMIT FOR PLUMBING WORK