NORTH & EAST ELEVATIONS: TUCKPOINT AS NECESSARY . REPLACE 100 BRICKS 300SQFT. ALL WORK SAME AS EXISTING. NO STRUCTURAL WORK.
SPR CBC 2019 INSTALLATION OF A BEAM SHORING STRUCTURE TO SUPPORT AND REINFORCE THE EXISTING JOISTS BELOW THE RESIDENTIAL UNIT ON 6805 N GREENVIEW(BASEMENT STORAGE)
REPLACE 18 WINDOWS AND SIDING ON EAST ELEVATION (6805-6811 N. GREENVIEW AVE.)
No details available
TUCKPOINT AS NEEDED AND REPLACE 100 BRICKS
No details available
ARRANGE PREMISE INSPECTION
POST OWNER/MANAGERS NAME/#
REPLCE WINDOW PANES, PLEXGLAS