A NEW AWNING WILL BE FABRICATED TO HELP REPRESENT THE BUSINESS IDENTITY.
SPR 2019 CBRC: INTERIOR BUILD-OUT OF EXISTING 1ST FLOOR COMMERCIAL SPACE W/ NEW RESTAURANT. NEW ADA BATHROOM. REMOVAL OF BASEMENT APARTMENT. ALL NEW HVAC, ELECTRICAL & PLUMBING. COMPLIANCE W/ BUILDING CODE VIOLATIONS. (B3-2 / B -BUSINESS GROUP) AS PER PLANS (CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTIONS)
REMODELING 1ST FLOOR
NEW 400 AMP SERVICE
REPAIR/REPLACE CERAMIC TILES, DRYWALL, INSULATION, FLOORING, CONCRETE STOOP, REPAIR CHIMNEY AND TUCKPOINT AS NEEDED. ELECTRICAL IS ON A SEPARATE PERMIT.
**ELECTRICAL ONLY PERMIT**INSTALL NEW RE-MODELING CAN LIGHTS.
PERMIT REQUIRED - CONTRACTOR
BLANK-TEXT MUST CITE CODE SECT
ARRANGE COMPLETED PERMIT INSP.
FOLLOW PLANS/RESUBMIT REVISED
GIVE VENT OPENINGS % FL. AREA
OBTAIN PERMIT BEFORE SIGN WORK
PLANS & PERMITS REQ - CONTRCTR
WORK NOT ALLOWED
EGRESS -BASEMENT
SEPARATION OF DWELLING ADEQUAT
LIGHT AND VENT