SPR 2019 CBRC: INSTALL NEW HVAC FOR 2ND FLOOR UNITS (#2F AND 2R)TO EXISTING 3 UNITS APARTMENT BUILDING (OCCUPANCY: A2 CONSTRUCTION TYPE: VB) AS PER PLANS
ARRANGE PREMISE INSPECTION
REPLACE (1) FURNACE.
ADD A METER FOR BASEMENT AND UTILITYS IN BUILDING
ARRANGE COMPLETED PERMIT INSP.
ARRANGE PREMISE INSPECTION
REPAIR EXTERIOR WALL
STOP/REMOVE NUISANCE
SUBMIT STRUCT. ENG. RPT (INT.)
PROVIDE GUTTER & DOWNSPOUT
CHIMNEY
CHIMNEY
DEBRIS, EXCESSIVE
REPAIR DEFECTIVE FOUNDATION
REPAIR INTERIOR WALLS/CEILING
SUBMIT STRUCT. ENG. RPT (INT.)
REPAIR EXTERIOR WALL
STRUCTURAL MEMBER, PIER BLOCK
COVER OUTLETS AND JBS
INSTALL SMOKE DETECTORS
CARB MONOX DETECT IN RESID