No details available
ARRANGE FOR INSPECTION
No details available
ERECT (1) SCAFFOLD FROM 11-17-2020 TO 11-17-2021
REPLACEMENT OF MAKE UP AIR UNIT WITH ONE ENGINEERED AIR 135 TON MAKE UP AIR UNIT, SELF CONTAINED, AIR COOLED, R410A, LOCATED ON THE ROOF.
ARRANGE COMPLETED PERMIT INSP.
MAINTAIN MECH. VENT SYSTEM
REPLCE WINDOW PANES, PLEXGLAS
POST OWNER/MANAGERS NAME/#
ARRANGE PREMISE INSPECTION
POST OWNER/MANAGERS NAME/#