SPR 2019 CBRC: REPAIR/REPLACE CONC./MTL WALKWAY & STAIRS W/ NEW ON 3-STORY (12) D.U. BLDG, SAME SIZE AND LOC. TO CORRECT VIOLATIONS, PER PLANS.
SPR 2019 CBC: REPAIR/REPLACE CONC./MTL WALKWAY & STAIRS W/ NEW ON 3-STORY (12) D.U. BLDG, SAME SIZE AND LOC. TO CORRECT VIOLATIONS, PER PLANS.
SAFE WORKING CONDITIONS
NOTIFY DOB, USE OF VACANT LND
STOP SMOKE, NOXIOUS ODORS
DWELLING CLEAN AND SANITARY
REPAIR EXTERIOR DOOR
REPLCE WINDOW PANES, PLEXGLAS
REPAIR/REPLACE SMOKE DETECTORS
REPAIR INTERIOR WALLS/CEILING
REPAIR EXTERIOR DOOR FRAME
REPAIR FLOOR
DEFECTIVE FIXTURES
REPLACE DEFECTIVE PLBG FIXTURE
INSECTS
DEBRIS, EXCESSIVE
CARB MONOX DETECT IN RESID
REPAIR EXTERIOR STAIR
PROVIDE
STOP/REMOVE NUISANCE
PROVIDE GUARD RAIL 42 IN HIGH
ARRANGE PREMISE INSPECTION
GRADE AND DRAIN LOT
REPAIR DOWNSPOUT
REPLACE D&H PORCH
OBSTRUCTIONS IN EXIT WAY
SERVICE WALK, PASSAGE, AREAWAY
ARRANGE PREMISE INSPECTION
FILE BLDG REGISTRATION
REPAIR PORCH SYSTEM
POST OWNER/MANAGERS NAME/#
STOP ODORS RPR DFT SEWAGE SYS