SPR 2019 CBC DE-CONVERSION (REMOVAL) OF 3RD ILLEGAL GARDEN APARTMENT IN A LEGAL TWO-FLAT RESIDENTIAL GROUP R-5 OCCUPANCY BUILDING AND REPAIRS TO THE EXISTING REAR EXIT STAIR. 3 MULTIPLE DWELLING UNITS DECONVERT TO 2 UNITS THERE WILL BE NO MODIFICATIONS TO THE EXISTING 1ST AND 2ND FLOOR APARTMENTS PER PLANS **CERTIFIED PLANS CORRECTIONS: CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTIONS **
REPAIR INTERIOR STAIR SYSTEM
REPAIR PORCH SYSTEM
REMOVE EXISTING REAR CANOPY IN THE REAQR OF A (2) DWELLING APT. BUILDING
REPAIR / REBUILD SHED
ARRANGE PREMISE INSPECTION