10 on file — type breakdown not available.
TEST ALTERED SYSTEM
Disposition: COMPLIED
OBTAIN PERMIT FOR PLUMBING
Disposition: COMPLIED
LICENSED BONDED PLMBG CONTRCTR
Disposition: COMPLIED
CONNECT AREA DRN TO CATCHBASIN
Disposition: COMPLIED
SOIL/WASTE,VENT PIPE MATRL
Disposition: COMPLIED
PROPER SIXE SOIL/WASTE PIPE
Disposition: COMPLIED
POST OWNER/MANAGERS NAME/#
REPAIR EXTERIOR STAIR
Disposition: COMPLIED
ARRANGE PREMISE INSPECTION
REPAIR EXTERIOR STAIR