No details available
TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 600 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. PARAPET REBUILDING: 20 SQ. FT. LOCATION: SOUTH AND WEST EXTERIOR FACADE.
MASON REPAIRS INCLUDES OUTER WYTHE REPLACEMENT(250SF),TUCKPOINTING(880 SF)SEALANT REPLACEMENT(250LF) AND LINTEL REPAIRS(ALL UNDER 6') - NO STRUCTURAL WORK.
No details available
REPAIR/ REPLACE 900 SQ FT GROUND FLR SLAB AND SANITARY PIPING AT EXISTING BLDG
No details available
WINDOWS (REPLACEMENT ONLY): QTY 10
FIRE ESCAPE: REPAIR/REPLACE BOLTS AT ALL CONNECTIONS AND ALL GUARDRAILS AND HANDRAIL POSTS. TUCK POINT (200 SQ FT) CONNECTION POINTS, REPAIR/REPLACE ANGLES ONLY.
PROTECT METAL MEMBERS
REPAIR EX. MET.
USE NEW BOLTS OR RODS
SEND EX. METAL LETTER
REMOVE RUST
F.E. RAILS
REPAIR/REPLACE LANDING SHOE
OPEN TYPE VIOLATION
POST CURRENT CERTIF PASS ELE
TEST G & S PASS ELE
ELIMINATE TRIPPING HAZARD PASS