THIS PROJECT INVOLVES THE INTERIOR RENOVATION OF THE EXISTING LIBRARY AT WALTER PAYTON COLLEGE PREPARATORY HIGH SCHOOL. THE PROPOSED SCOPE INCLUDES NEW INTERIOR FINISHES, UPDATED LIGHTING, REVISED CEILING SYSTEMS, AND CASEWORK IMPROVEMENTS TO ENHANCE FUNCTIONALITY AND ACCESSIBILITY. ELECTRICAL AND LOW-VOLTAGE MODIFICATIONS ARE ALSO INCLUDED TO SUPPORT NEW TECHNOLOGY AND INFRASTRUCTURE NEEDS, IN ACCORDANCE WITH CPS DESIGN STANDARDS.THE EXISTING FACILITY IS CLASSIFIED AS A SCHOOL WITH AN E-1 OCCUP
No details available
SPR 2019 CBC REPLACEMENT OF EXISTING ROOFTOP CHILLERS WITH NEW IN KIND, ON EXISTING STEEL FRAMING STRUCTURE PER PLANS. `**CERTIFIED PLANS CORRECTIONS: CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTIONS **
No details available
No details available
CPS SCHOOL. NO CHANGE IN USE: EXISTING 1B CONSTRUCTION C3 USE HIGH SCHOOL. EXISTING SCIENCE CLASSROOMS ARE UPDATED.
No details available
No details available
No details available
2017 FIRE SERVICE UPGRADE MANDATE ON TWO (2) 3-FLOOR HYDRAULIC PASSENGER ELEVATORS #E 2000LB.CAP, #W 2500LB.CAP, IN PAYTON SCHOOL. PURSUANT TO THE SCOPE OF WORK SUBMITTED. EV019523
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA
MAINTAIN OR REPAIR HYDRO ELEVA