No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
No details available
WORK NOT ALLOWED
CORRECT PLUMBING VIOLATIONS ONLY: INSTALL APPROVED HUB CONNECTION AT 4" CAST IRON VENT THROUGH ROOF AT REAR; INSTALL GREASE TRAP AT 3 COMP SINK; INSTALL BACKFLOW PREVENTER, ADD VAC BREAKER AT WATER HEATER, REPLACE PLASTIC WATER SUPPLIES, ADD RIGID DISCHARGE PIPING AT TEMP AND PRESSURE RELIEF VALVE AT WH, REPAR WH FLUE.
CLOSE ALL OPEN JUNCTION BOXES IN CEILING. INSTALL NEW MAT AND COVER FOR OPEN PANEL. CHANGE WORN BREAKERS AND REDRESS WIRING IN PANEL. CLOSE ALL OPEN SPACES IN PANELS. INDEPENDENTLY SUPPORT LIGHTING FIXTURES IN CEILING. INSTALL RACEWAY WITH OUTLETS FOR POWER TO REPLACE EXTENSIONS COMING FROM CEILING. DRESS UP LOW VOLTAGE WIRING IN CEILING. INSTALL METAL EXIT/BATTERY BACK UP EXIT SIGN. BOND ALL PANELS TOGETHER. INSTALL COMBO CO2 AND CARBON MONOXIDE DETECTORS. PER DEPT. OF BUILDINGS INSPECTION RE
CORD TO FIXTURE
PROVIDE ADEQUATE SUPPORT
No description available