CBC 2019 SPR: INTERIOR RENOVATIONS & REMODELING AT EXISTING FIRST FLOOR GALLERY. REPLACE BATHROOM FIXTURES, COUNTERS, CABINETS & FIXTURES. NEW LIGHTING THROUGHOUT. PLUMBING & ELECTRICAL REPAIRS. FURNACE REPAIR AND DUCKWORK REPLACEMENT. (B3-2 / A3 ASSEMBLY GROUP & R3 (2) APARTMENTS @ 2ND FLOOR)
CBC 2019 SPR: INTERIOR RENOVATIONS & REMODELING AT EXISTING FIRST FLOOR GALLERY. REPLACE BATHROOM FIXTURES, COUNTERS, CABINETS & FIXTURES. NEW LIGHTING THROUGHOUT. PLUMBING & ELECTRICAL REPAIRS. FURNACE REPAIR AND DUCKWORK REPLACEMENT. (B3-2 / A3 ASSEMBLY GROUP & R3 (2) APARTMENTS @ 2ND FLOOR)
EXTERIOR ALTERATIONS AT THE NORTH ELEVATION TO CREATE (2) WINDOW OPENINGS TO AN EXISTING 2 STORY W/BASEMENT BRICK RESIDENTIAL BUILDINGAS PER PLANS (CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTIONS)
OBSTRUCTIONS IN EXIT WAY
ARRANGE PREMISE INSPECTION
REPAIR EXTERIOR WALL
CHIMNEY
WINDOW REPAIR FOR AIR SEEPAGE
ACCESS TO ROOF
ARRANGE FOR RE-INSPECTION
ACCESS TO ROOF
ARRANGE FOR RE-INSPECTION
MAINTAIN EXIT SIGN ILLUMINATED
PROVIDE GUARD RAIL 42 IN HIGH
FIRE EXTNGSHR REQ, RESDNTL
UNDERSIDE STAIR 1HR FIRE RES
POST OWNER/MANAGERS NAME/#
STOP LEAKING WATER
EXPOSED WIRING
INSTALL SMOKE DETECTORS